My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
75C - PH - THE BOWERY
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
08/18/2020
>
75C - PH - THE BOWERY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/13/2020 5:10:27 PM
Creation date
8/13/2020 4:53:25 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Planning & Building
Item #
75C
Date
8/18/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1021
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Bowery Mixed -Use Project 3. Revisions to the Draft EIR <br />The first full paragraph on page 5.12-4, Section 5.12, Public Services, is revised as follows: <br />This res'dential and employee population is expected to create the typical range of service calls to OCFA <br />that are largely related to medical emergencies, which consist of 6--5 $1 percent of service calls; while fire <br />calls consisted of 4-� 2 percent of OCFA service calls in Santa Ana during 2018. <br />The following bullet point is added as the fourth bullet point on page 5.12-5 in Section 5.12, Public <br />Services. <br />• Access to and around structures would include ladder access on at least two sides of each structure. <br />Section 5.13, Parks and Recreation <br />The paragraph on Page 5.13-3, Section 5.13.2 Environmental Setting, is revised as follows: <br />In addition, there are 9 10 existing City of Tustin park facilities that provide 92-9 97.9 acres of parkland <br />and 3 existing City of Irvine park facilities within 3 miles of the Project site that provide 63.6 acres of park <br />and recreation space, as listed in Table 5.1 3-2. Thus, the total existing parkland within 3 miles of the Project <br />site is 23838 243.38 acres. <br />Table 5.13-2, Tustin and Irvine Park and Recreation facilities Within Three Miles of the Project Site, on <br />Pages 5.13-3 and 5.14-4 is revised as follows: <br />Ron Foell (Greenwood) <br />Plavaround. Amphitheater <br />Basketball Court. 2 Bocce Ball courts <br />5 acres <br />1.9 miles <br />Drivina: 4 minutes <br />Walking: 39 minutes <br />Park Windrow Rd <br />1.4 miles of Wplkina Trail; Picnic <br />Pavilions <br />Total of Tustin Parkland Within 3 Miles of the Project Site <br />9Z-4 97.9 acres <br />The last two sentences on Page 5.1 3-5, Section 5.13.2, Environmental Impacts, is revised as follows <br />In addition, there are 9-2-.9 97.9 acres of parkland within the City of Tustin and 63.6 acres of parkland <br />within the City of Irvine Park facilities (listed in Table 5.1 3-2) that are also within 3 miles of the Project site <br />and are likely (clue to location) to be used by residents of the proposed Project. This equals approximately <br />2-45.38 243.38 acres of existing parkland within three miles of the site, which equates to 5,136.3-6-ems <br />5,094.49 square feet of parkland per Project resident at full occupancy. <br />Table 5.13-3, Average Travel Time in Southern California to Outdoor Recreation Areas, on Page 5.13- <br />6 is revised as follows: <br />Table 5.13-3: Average Travel Time in Southern California to Outdoor Recreation Areas <br />Mode <5 min 6.10 min 11-F2 20 min 21-60 min 1 >60 min <br />Driving 1 20.1 % ( 17.2% j 20.8% 31.3% 10.6% <br />S-ate Parks, 2014. <br />Section 5.14, Transportation <br />All of the revisions to Section 5.14, Transportation, of the Draft EIR are provided in Attachment A, to this <br />Chapter 3, Revisions to the Draft EIR. <br />Chapter 6.0, Alternatives <br />C ty of Santa Ana <br />Final E'R <br />April 2020 <br />3-10 <br />75C-973 <br />
The URL can be used to link to this page
Your browser does not support the video tag.