My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTEC CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
S
>
SANTEC CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:54:00 AM
Creation date
10/28/2020 2:09:05 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTEC CONSULTING SERVICES, INC.
Contract #
A-2020-205-03
Council Approval Date
10/20/2020
Expiration Date
10/19/2023
Insurance Exp Date
10/1/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Recycled Water/Stormwater Harvesting Feasibility <br />Study <br />Port of Long Beach, CA <br />At the ever-growing business hub, the Port adopted the <br />Green Port Policy aimed at implementing environmentally <br />sustainable port operations. The Green Port Policy employs <br />guiding principles for the Ports environmental protection <br />efforts. One of its key initiatives is to reduce potable water <br />demand. The recycled water feasibility study included <br />identifying and evaluating alternative sources of recycled <br />water that could be available to supply the Port customers, <br />evaluating the feasibility of constructing a wastewater <br />treatment plant to be owned and operated by the Port as <br />well as identifying potential recycled water customers, <br />identifying acceptable recycled water uses and preparing an <br />engineer's estimate of probable construction costs for the <br />various identified alternatives. <br />As a separate task, the stormwater harvesting study <br />was performed to evaluate opportunities for stormwater <br />harvesting and reuse. The stormwater harvesting and reuse <br />feasibility study identified infrastructure requirements and <br />costs to capture and reuse all stormwater originating from <br />the Harbor District. The study also evaluated construction <br />and operational impacts on port terminals, and feasibility and <br />costs of diversions from Port stormwater infrastructure to the <br />sanitary sewer. Stantec developed an engineer's estimate <br />of probable construction costs for the various identified <br />alternatives and conducted a triple bottom line benefit cost <br />analysis to prioritize the different opportunities. <br />Key Elements <br />The possible end uses for recycled stormwater were <br />evaluate and quantified, in addition to evaluating the <br />monetary value of harvested stormwater and determine if <br />it could be sold to end users in the Harbor District or water <br />purveyors, or diverted to the planned City of Long Beach <br />Municipal Urban Stormwater Treatment facility. <br />Team Members <br />• Roger Chung, PE, CFM, QSD/P, F. ASCE—Stantec <br />• Ed Othmer, PE, CPESC, CPSWQ, QSP/D ToR, QISP <br />ToR, ENV SP, PMP—Stantec <br />• Rupeet Malhotra, PE, QSD, QISP, LEED AP—Stantec <br />Project Dates <br />2019-Ongoing <br />Reference <br />Dylan Porter <br />Environmental Planning <br />Port of Long Beach <br />415 W Ocean Blvd., Long Beach, CA 90802 <br />T: 562-283-7118 <br />E: dylan.porter@polb.com <br />mStantec • Proposal for On -Call Stormwater Project Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.