My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SANTEC CONSULTING SERVICES, INC.
Clerk
>
Contracts / Agreements
>
S
>
SANTEC CONSULTING SERVICES, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2024 8:54:00 AM
Creation date
10/28/2020 2:09:05 PM
Metadata
Fields
Template:
Contracts
Company Name
SANTEC CONSULTING SERVICES, INC.
Contract #
A-2020-205-03
Council Approval Date
10/20/2020
Expiration Date
10/19/2023
Insurance Exp Date
10/1/2024
Destruction Year
2028
Notes
For Insurance Exp. Date see Notice of Compliance
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
94
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
East San Gabriel Valley Watershed Management <br />Plan and Coordinated Integrated Monitoring <br />Program (CIMP) <br />East San Gabriel Valley Watershed <br />Management Group, CA <br />Stantec is currently implementing the CIMP for the Group <br />which is comprised of the Cities of Pomona, Claremont, San <br />Dimas, and La Verne. The CIMP evaluates impacts from <br />MS4 discharges and provides decision support for actions to <br />improve water quality and comply with the MS4 Permit. <br />Three years of CIMP implementation have yielded <br />information critical to establishing a regional BMP program <br />and adaptive management, including the planning, <br />permitting, and installation of six permanent sample <br />stations. Permit compliance is determined on a yearly <br />basis. Additionally, Stantec developed and is implementing <br />a process to identify and prioritize multi -benefit regional <br />stormwater capture opportunities (LID projects). <br />Stantec will perform the reasonable assurance analysis <br />(RAA) to determine the volume of stormwater needed to <br />be captured/treated within each subwatershed in each <br />jurisdiction to achieve zinc, E Coll, and nitrogen load <br />reduction goals (as it is assumed that zinc, E.coli, and <br />nitrogen are the limiting pollutants in the watershed). Once <br />the volume capture requirement is established, Stantec will <br />establish shortfalls for compliance with stormwater capture <br />goals (i.e.. subwatersheds with not enough or no planned <br />projects). <br />The RAA is the compliance mechanism to meet the Water <br />Quality -Based Effluent Limits (WQBELs) and Receiving <br />Water Limitations (RWLs) provisions of the MS4 Permit. <br />Stantec will update the RAA applying the Watershed <br />Management Modeling System (WMMS) developed <br />by the County of Los Angeles. Cost -benefit analysis <br />for the prioritized projects will be also conducted. As a <br />final deliverable, Stantec will develop the Watershed <br />Management Plan for the ESGV. <br />Key Elements <br />• Updating the WMMS model by meteorological data <br />(85%-24-hr Design Storm) <br />• Updating land use information <br />• Updating impervious area information <br />• Updating the jurisdiction -based load reduction goals <br />• Recalibrating model based upon observed CIMP data <br />(2015-2019) <br />• Inputting identified regional BMPs <br />Team Members <br />• Ed Othmer, PE, CPESC, CPSWQ, QSP/D ToR, QISP <br />ToR, ENV SP, PMP—Stantec <br />• Rupeet Malhotra, PE, QSD, QISP, LEED AP—Stantec <br />Project Dates <br />2018-Ongoing <br />Reference <br />Julie Carver <br />Environmental Compliance Supervisor <br />Water Resources Department <br />T. 909-620-3628 <br />E: julie_carver@ci.pomona.ca.us <br />Stantec • Proposal for On Call Slmmwater Project Design Services <br />
The URL can be used to link to this page
Your browser does not support the video tag.