My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
O NE B RO A D WA Y P LA Z A P RO J E CT E I R A D DE N DU M CI T Y O F S A NT A A NA <br />5. Environmental Analysis <br />Page 100 PlaceWorks <br />c) Require the installation or maintenance of associated infrastructure (such as roads, fuel breaks, <br />emergency water sources, power lines or other utilities) that may exacerbate fire risk or that may <br />result in temporary or ongoing impacts to the environment? <br />No Impact. The Proposed Project is located in an urban environment and is surrounded by existing <br />development. Installation or maintenance of associated infrastructures would not exacerbate fire risk or result <br />in temporary ongoing impacts to the environment as wildland nor wildland interface areas exist at or around <br />the Project Site area. No impact would occur for the Proposed Project and no changes or new information <br />would require preparation of a subsequent EIR. <br />d) Expose people or structures to significant risks, including downslope or downstream flooding or <br />landslides, as a result of runoff, post-fire slope instability, or drainage changes? <br />Less Than Significant Impact/No Changes or New Information Requiring Prepar ation of an EIR. <br />As discussed in the Certified EIR, the Project Site is flat and located in an urbanized area. The Project Site is <br />not subject to landslides or slope instability. The Project Site is not located in or adjacent to wildland area. As <br />with the Approved Project, adherence to appropriate mitigation would assure that impacts related to runoff <br />and drainage changes for the Proposed Project would remain less than significant. As documented in this <br />analysis, the Proposed Project would not result in new significant impacts or a substantial increase in the severity <br />of previously identified effects and is consistent with the Certified EIR and would not require the preparation <br />of a subsequent EIR. <br />5.20.3 Adopted Mitigation Measures Applicable to the Proposed Project <br />Refer to Mitigation Measure PS-1 through PS-9 under the Section 5.15, Public Services. <br />5 - 154
The URL can be used to link to this page
Your browser does not support the video tag.