My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Mike Harrah <br />Caribou Industries, Inc. <br />March 9, 2020 <br />Page 4 of 6 <br /> <br /> <br />13141-04 TG Letter <br />TABLE 4: PROPOSED PROJECT TRIP GENERATION SUMMARY <br /> <br />PROJECT TRIP GENERATION COMPARISON <br />As shown in Table 5, the development of the proposed Project is anticipated to generate 3,660 fewer <br />trip-ends per day with 483 fewer AM and 494 fewer PM peak hour trips as compared to the currently <br />approved Project. This equates to a 65% reduction during the AM, and 60% reduction during the PM <br />peak hours and a 55% reduction to daily trip-ends. <br />TABLE 5: TRIP GENERATION COMPARISON <br /> <br />Land Use Quantity Units1 In Out Total In Out Total Daily <br />Multifamily Housing (High-Rise) (Tower)402 DU 34 55 89 54 39 93 868 <br />Office (Tower)253.728 TSF 109 18 127 17 92 109 1,092 <br />Office (Rehabilitated Structures)9.803 TSF 10 2 12 2 9 11 96 <br />Shopping Center (Tower & Garage)8.525 TSF 5 3 8 16 17 33 322 <br />0 0 0 -5 -5 -10 -110 <br />5 3 8 11 12 23 212 <br />Quality Restaurant (Tower)15.915 TSF 6 6 12 83 41 124 1,334 <br />0 0 0 -18 -18 -36 -588 <br />6 6 12 65 23 88 746 <br />High Turnover (Sit-Down) Restaurant <br />(Rehabilitated Structures)2.681 TSF 15 12 27 16 10 26 302 <br />0 0 0 -4 -4 -8 -130 <br />15 12 27 12 6 18 172 <br />-9 -5 -14 -8 -9 -17 -160 <br />170 91 261 153 172 325 3,026 <br />1 DU = dwelling units; TSF = thousand square feet <br />AM Peak Hour PM Peak Hour <br />Proposed Project Total <br />Pass-by Reduction (PM/Daily: 44%): <br />Pass-by Reduction (PM/Daily: 43%): <br />High Turnover (Sit-Down) Restaurant Total: <br />Quality Restaurant Total: <br />Pass-by Reduction (PM/Daily: 34%): <br />Shopping Center Total: <br />Transit Mode Share Reduction (5%): <br />Project In Out Total In Out Total Daily <br />Currently Approved1 637 107 744 211 609 819 6,686 <br />Proposed Project 2 170 91 261 153 172 325 3,026 <br />Variance -467 -16 -483 -58 -437 -494 -3,660 <br />1 Trip generation based on the currently approved Project per the 2002 Traffic Study (see Table 2). <br />2 Proposed Project trip generation (see Table 4). <br />AM Peak Hour PM Peak Hour <br />5 - 258
The URL can be used to link to this page
Your browser does not support the video tag.