My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5 1109 N BROADWAY
Clerk
>
Agenda Packets / Staff Reports
>
Planning Commission (2002-Present)
>
2020
>
03-30-20 Special Meeting
>
5 1109 N BROADWAY
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/9/2020 9:33:47 PM
Creation date
11/9/2020 9:31:36 PM
Metadata
Fields
Template:
PBA
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
275
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />WATER & SEWER COMPARISON <br /> ONE BROADWAY PLAZA <br />SANTA ANA, CALIFORNIA <br /> <br />2 <br /> <br /> <br />II. CURRENT ENTITLED CONDITION <br /> <br />The property as currently entitled, consists of a mixed-use high-rise with offices & <br />executive office suits and various other uses. The section below describes the current <br />entitled demand for domestic water and wastewater service. <br /> <br />WATER SERVICE <br /> <br />There is a 12” water line adjacent to the project site in N. Broadway. <br /> <br />Land Use Unit Water Demand Factor (1) Area <br />(square feet) <br />Daily water Usage <br />(gpd) <br />Mixed-use 0.09 gpd/sf 518,003 sf 46,621 <br />Notes: <br />(1) Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.09 gpd/sf) <br /> <br /> <br /> <br />As shown above current entitled water demand at the project site is estimated to be <br />approximately 46,621 gallons per day (gpd). <br /> <br />WASTEWATER SERVICE <br /> <br />There is a 15” sewer line adjacent to the project site in N. Broadway. <br /> <br />Land Use Unit Water Demand Factor (1) Area <br />(square feet) Average Sewer Flow (gpd) <br />Mixed-use 0.0765 gpd/sf 518,003 sf 39,628 <br />Notes: <br />(1) Unit Water Demand Factor was taken from the City of Santa Ana Transit Zoning Code EIR (0.0765 gpd/sf) <br /> <br /> <br /> <br />As shown above existing average sewer flow at the project site is estimated to be <br />approximately 39,628 gallons per day (gpd). <br /> <br />5 - 267
The URL can be used to link to this page
Your browser does not support the video tag.