Laserfiche WebLink
Santa Ana Redhill Development <br /> <br /> <br /> <br /> <br />Prepared for: City of Santa Ana <br /> <br />AECOM <br />27 <br /> <br /> <br />During the Construction phase of the Project, IMPLAN estimates that the direct, indirect, and induced impacts of <br />Project construction would support 4,454 jobs and generate over $795 million of total economic output for Orange <br />County, with 2,491 jobs and over $498 million in economic output occurring within the City of Santa Ana. <br />Employment and output estimates for construction offer insight into the cumulative economic impacts of construction <br />during the construction phase. For the construction phase, employment repres ents Full Time Equivalencies (FTE), <br />while for the operations phase, employment includes all wage and salary employees, as well as proprietors. (This is <br />the same methodology used by the BEA and BLS3.) Thus, construction impacts are one-time impacts, while ongoing <br />operations impacts can be interpreted as recurring annual impa cts. <br />Table 18: Industrial Prototype Construction Economic Impacts <br />Estimated Economic Impact of Industrial Prototype Construction <br />City of Santa Ana <br />Impact Employment Labor Income Value Added Output <br />Direct 501 $39,230,000 $49,600,000 $75,000,000 <br />Indirect 3 $270,000 $450,000 $706,000 <br />Induced 1 $60,000 $118,000 $185,000 <br />Total 506 $39,560,000 $50,100,000 $76,000,000 <br />Rest of Orange County <br />Impact Employment Labor Income Value Added Output <br />Direct N/A N/A N/A N/A <br />Indirect 49 $3,900,000 $6,500,000 $10,000,000 <br />Induced 166 $9,160,000 $16,900,000 $26,470,000 <br />Total 216 $13,100,000 $23,4000,000 $36,500,000 <br />Total Countywide 722 $52,600,000 $73,500,000 $112,500,000 <br />Note: Numbers are rounded and may not sum <br />Source: IMPLAN, AECOM <br /> <br />During the Construction phase of the Industrial Prototype, IMPLAN estimates that the direct, indirect, and induced <br />impacts of construction would support 722 jobs and generate over $112 million of total economic output for Ora nge <br />County, with 506 jobs and over $75 million in economic output occurring within th e City of Santa Ana. <br />The economic output from the Construction phases would occur as a one-time impact and does not represent the <br />generation of operational long-term income or employment. <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />3 Bureau of Labor Statistics employment definitions: https://www.bls.gov/cps/lfcharacteristics.htm#emp <br />3-254