Laserfiche WebLink
Santa Ana Redhill Development <br /> <br /> <br /> <br /> <br />Prepared for: City of Santa Ana <br /> <br />AECOM <br />29 <br /> <br />Table 20: Industrial Prototype Operations Economic Impact <br />Economic Impact of Industrial Prototype Operations <br />City of Santa Ana <br />Impact Employment Labor Income Value Added Output <br />Direct 608 $65,100,000 $92,300,000 $149,000,000 <br />Indirect 29 $2,000,000 $2,800,00 $4,180,000 <br />Induced 2 $107,000 $200,000 $330,000 <br />Total 638 $67,200,000 $95,300,000 $153,500,000 <br />Remainder of Orange County <br />Impact Employment Labor Income Value Added Output <br />Direct N/A N/A N/A N/A <br />Indirect 390 $27,700,000 $42,000,000 $62,830,000 <br />Induced 383 $21,000,000 $39,000,000 $60,900,000 <br />Total 773 $48,790,000 $81,000,000 $123,740,000 <br />Total Countywide 1,411 $116,000,000 $176,200,000 $277,000,000 <br />Note: Numbers are rounded and may not sum <br />Source: IMPLAN, BLS, California DOF, AECOM <br /> <br />For ongoing operations of the Industrial Prototype, IMPLAN estimates that the direct, indirect, and induced impacts of <br />construction would annually support approximately 1,411 jobs and generate over $277 million of total economic <br />output for Orange County, with 638 jobs and over $153 million in economic output occurring within the City of Santa <br />Ana. <br />AECOM assumed industrial operations at buildout would include a mix of engineering, professional/technical <br />services, research and development, and wholesale trade. AECOM assumed the Project’s 320,000 SF of industrial <br />space could support approximately 608 employees at structural occupancy (500 SF/employee). <br />The Industrial Prototype would be estimated to generate more employment and economic output than the equivalent <br />factors for the Project. Sectors utilizing this space have significant potential to add value to a local economy beyond <br />what is measurable in taxable sales on site. <br /> <br />3-256