My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Northeast Police Station <br />Los Angeles, California <br />Gruen Associates was the Design Architect and Landscape Architect <br />for the new $22.7 Million replacement police station. The primary goal <br />for the project was to provide a state-of-the-art facility, which not only <br />improves police operations, but also acts as a catalyst for improving <br />the architectural fabric of the surrounding area. <br />After evaluating new police stations associated with the Proposition <br />Q program, a site adaptation of Olympic Station was the Los Angeles <br />Police Department's proposed model forthe new Northeast Station. The <br />new station building largely maintains the programmatic adjacencies <br />and floor plan layouts established at Olympic Station, while making <br />selective architectural modifications for site conditions. <br />A phased construction plan on a very tight site places the new <br />replacement station on a surface parking area directly adjacent to the <br />existing station. Upon completion of the new station, the existing station <br />will undergo a partial demolition on the western side, leaving room for <br />new surface parking to occur. The portion of the existing building that <br />remains houses the maintenance garage and related spaces. This <br />project earned a LEED Silver certification. <br />City of Los Angeles <br />Current Status: <br />Completed 2016 <br />Budget: <br />$22.7 Million <br />Sgt. II Patrick McAree <br />LAPD Project Manager & Facilities <br />Consultant <br />(818) 903-5387 cell <br />26236@lapd.lacity.org <br />Firm / Team Role: <br />Gruen Associates - Design Architect, <br />Landscape Architect: <br />- Michael Enomoto, Partner -in -Charge <br />- Craig Biggi, Project Manager and <br />Designer <br />- Dean Howell, Landscape Architect <br />-Teresa Sanchez, Construction <br />Administration Manager <br />Englekirk - Structural Engineer <br />City of Santa Ana <br />RFP for Space Planning and Architectural Consulting Service%%� 14 GRUENASSOCIATES <br />RFPNn. 20_040 25G-332 AnCHITECTUFE PLANNING INTEFICPE l FD5G4'E <br />
The URL can be used to link to this page
Your browser does not support the video tag.