My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Division 16 Southwestern Yard <br />Los Angeles, California <br />The Metro Division 16 Southwestern Yard (SW Yard) is a new Metro Light <br />Rail Vehicle (LRV) operations and maintenance facility constructed within <br />an approximate 18-acre site bounded by Arbor Vitae Street to the north, <br />Neutrogena Corporation to the west, industrial buildings and warehouses to <br />the south, and the planned construction of the new CrenshawMX Transit <br />Corridor Project (also referred to as the C0988 Mainline Project) tracks to <br />the east The SW Yard is connected to the mainline tracks by two at -grade <br />connections; one at the southeastern end of the SW Yard, and the other <br />crossing Arbor Vitae Street north ofthe SW Yard site. Pedestrians and vehicles <br />access the SW Yard from two controlled entrances along Arbor Vitae Street. <br />SW Yard supports the Crenshaw/LAX Transit Condor Project and provides <br />LRV transportation maintenance and storage functions, current use and <br />future expansion for the Metro Crenshaw/LAX Project and Metro Green Line <br />LRV fleet The SW Yard is a secured facility consisting of tracks, buildings, <br />equipment, supporting systems, miscellaneous appurtenances, and related site <br />development Thetrack configuration and site layout supportsafe and efficient <br />LRV movements for "switching" between facilities and tracks, and between the <br />yard facility and the mainline tracks. SW Yard also accommodates Metro staff <br />and other employees engaged in general administration, operations, repair <br />and maintenance, and transit security. SW Yard consists of a Main Shop, Car <br />Wash Building, Material Storage Building (and Future Expansion), Cleaning <br />Platform, and Paint and Body Shop Building. The project achieved LEED <br />Silver certification - <br />Metro <br />Current Status: <br />2019 <br />Budget: <br />$172 Million <br />Contact: <br />Robert Rincon, Project Manager <br />5777 West Century Boulevard, Suite 310 <br />Los Angeles, CA 90045 <br />213.864.0285 <br />RinconR@metro.net <br />Firm / Team Role: <br />Gruen Associates - Architect, Landscape <br />Architect: <br />- Debra Gerod, Partner -in -Charge <br />- Jill Wagner, Project Manager <br />- Craig Biggi, Project Designer <br />-Alex Chow, Intermediate Designer <br />- Dean Howell, Landscape Architect <br />-Teresa Sanchez, Construction <br />Administration Manager <br />Gannett Fleming - Engineering Prime <br />Consultant <br />City of Santa Ana <br />RFP for Space Planning and Architectural Consulting Service%%� is GRUENASSOCIATES <br />RFPNo. 20_040 25G-333 APOHITEQTLriE PLANNING INTEFIQf'.`.. LFDS04'_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.