My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
built- Westminster Corportate Yard <br />.s' <br />rendering- site contest <br />interior- Westminster Pd ice Training Fad lity <br />Address, 14381 Olive St., Westminster, CA 92683 <br />s ;, <br />Project Description: <br />The existing city <br />maintenance yard facility <br />built in the early 1960s, is <br />overcrowded, inefficient, <br />and no longer sufficient <br />to implement the city's <br />needs as a maintenance <br />facility. GPa was obtained <br />to update and expand <br />the current facility. The new <br />corporate yard includes <br />a new administration <br />building, canopy, fuel station, and warehouse facilities. The <br />renovation and addition takes place within the existing site <br />of the city's current municipal facility along With an adjacent <br />building the city has obtained for a police training facility <br />requiring renovation. Another building housing the Boys and <br />Girls Club was also renovated as a part of this project, <br />One of the challenges of this project was that the facility is <br />required to be operational during the course of renovation. <br />GPa worked with the city for a phasing plan to relocate staff <br />and keep it operational during the course of construction. <br />The new building contains notable sustainable features and <br />reflects the residential scale of the surrounding residential <br />neighborhood. GPa completed the space planning and <br />furniture procurement for the both the corporate yard and <br />the police training facility. We also provided code updated <br />retrofits for the Boys and Girls Club, <br />Key Personnel: <br />Jack Panichapan - Jack was responsible for the design <br />of this project from the exterior to the interior including <br />furnishings. Jack Panichapan was the project manager <br />and the main point of contact and coordinator throughout <br />the entire project for the City. He coordinated and tracked <br />of all processes with the client and sub -consultants and <br />handled any discrepancies to ensure accuracy in the <br />delivery of the project. <br />Kent bueter - Kent was the Project Architect and was in <br />charge of the construction documents and construction <br />administration for the project which also included <br />coordinating documents between all disciplines. <br />Vic Nguyen -Vic was the Project Architect and was in charge <br />of the PDR, design, rendering, entitlements, construction <br />documents and construction administration for the project <br />which also included coordinating documents between all <br />the disciplines, <br />Protect Size, I7,000sf <br />Completion Dale, 2015 <br />Municipal I Corporate y <br />25a-,M rg <br />0 <br />City of Santa Mo- RFP <br />Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.