My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25G - AMGT FOR SPACE PLANNING
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2020
>
11/17/2020
>
25G - AMGT FOR SPACE PLANNING
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2020 5:55:10 PM
Creation date
11/12/2020 3:22:00 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Public Works
Item #
25G
Date
11/17/2020
Destruction Year
2025
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
528
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ouury aan �aona niun aPai raga <br />rendering- San Gabnel Municipal Yard <br />rendering- San Gabnel Municipal Yard <br />rendering- San Gabnel Municipal Yard <br />Address 927 E Grand Ave„ San Gabriel, California 90680 <br />Project Description: <br />The Municipal Yards Facility artfully combines the <br />diverse and evolving programming needs of the <br />Public Works Department for the City of San Gabriel <br />which encompasses the Maintenance Division, <br />Engineering, and Administration Staff into one facility <br />on a challenging and limited site. Located on a <br />3.5 acre narrow sloping parcel of land bordering a <br />wash on one side and homes on another, the new <br />Maintenance Facility for the city of San Gabriel had <br />programmatic challenges with vehicular circulation, <br />and noise mitigation that were resolve architecturally. <br />The facility considers sustainable design features such <br />as native plantings, recycled materials, and north - <br />south fenestration orientation for energy efficiency. <br />GPa was responsible for developing the needs <br />assessment and programming for the facility and <br />proceeded through design and construction <br />documentation. <br />Key Personnel: <br />Jack Panichapan - Mr. Panichapan acted as the <br />Principal in Charge and was responsible for the design <br />of this project for the exterior and interior including <br />furnishing. <br />Kent bueter - Mr. bueter was the Project Architect and <br />was in charge of the construction documents and <br />construction administration for the project which also <br />included coordinating documents between all the <br />disciplines. <br />Protect Size; 34,600sf <br />Completion Date, 2016 <br />Municipal I Corporate YA6=MMA <br />City of Santa Mo- RFP <br />
The URL can be used to link to this page
Your browser does not support the video tag.