Laserfiche WebLink
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313 <br />GOVERNOR GEORGE DEUKMEJIAN COURTHOUSE <br />Long Beach, California <br />Winning Multiple Awards for a 3P <br />Project <br />Syska's work on the Long Beach Courthouse, <br />a public -private partnership, included <br />designing, constructing, financing, operating, <br />commissioning, and maintaining the building, as <br />well as renovating the existing parking structure. <br />The new courthouse, which provides space and <br />services forjudlclal proceedings in Los Angeles <br />County's Superior Court, replaces a 50-year-6d <br />existing structure. <br />The design includes 31 courtrooms with <br />accompanying holding cells, administrative <br />office space, and secure parking. It also includes <br />office space used by the County of Los Angeles <br />for administrative purposes and additional office <br />space for commercial and retail tenants. <br />We developed a cabling infrastructure <br />system for technology distribution to support <br />communications for staff, employees, and <br />visitors. The technology distribution centered <br />on passive (structured cabling) and active <br />equipment (network equipment). <br />The infrastructure provided an optimal level of <br />performance, reducing the operating costs in <br />support of multiple integrated and converged <br />systems for voice, data, wireless, AV, BMS, and <br />security. <br />Our team used a number of innovative solutions <br />to overcome the project's technological <br />challenges through a versatile cabling <br />infrastructure that can accommodate future <br />converged networks. The project received <br />multipleawards including Design -Build Institute <br />of America's (DBIA) Civic Buildings, National <br />Award of Merit, and ENR's 2014 Best Global <br />Project. <br />Project Features <br />• Public Private Partnership <br />A <br />A <br />Services Provided <br />CH modeling, Mechanical, Electrical, Plumbing, <br />BIMIRevit, IT/Telecommunications <br />Size <br />531,000 sf <br />4 & 5 Stories (two buildings) <br />Completion Date <br />2013 <br />Construction Cost <br />$300,000,000 <br />Sustainability <br />LEED Gold <br />