Laserfiche WebLink
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313 <br />P <br />L-A <br />e <br />CONFIDENTIAL TRANSPORTATION AGENCY - <br />CONSOLIDATION AND EXPANSION <br />San Francisco, California <br />The confidential Transportation Agency's real- <br />time command and control functions resided in <br />5 different locations dispersed around the city <br />with undersized facilities and outdated systems. <br />Seeking to consolidate Its real-time command <br />and control functions into a single, adequately - <br />sized, secure facility with fully Integrated and up- <br />to-date systems, the agency leased the 7th floor <br />of a building In the heart of the city. The design <br />environment accommodated a raised floor <br />design, providing heavy power and emergency <br />power generation with a 90,000 gallon diesel <br />fuel tank on site. Also on site were provisions for <br />200,000 gallons of water, high security design, <br />and extraordinary HVAC capacity and chiller <br />capacity for the agency's Computer Room Air <br />Conditioning (CRAG) units. <br />The agency selected Syska to design <br />the mechanical, electrical and plumbing <br />systems for the new sustainable building. The <br />design included a raised floor environment <br />with Computer Room Air Handling (CRAH) <br />units tied to chilled water, two new server and <br />command rooms with central UPS, which tied <br />into the buildings generators, N+1 CRAC units, <br />underfloor supply/overhead return, hot & cold <br />aisle, new VAV boxes, low pressure ductwork, <br />new lighting power distribution, fire alarm <br />system and associated components. The <br />new plumbing system'r6uded a break room <br />and shower room. <br />Syska also provided LEED consulting and <br />commissioning services. Syska's commissioning <br />approach, Integrating owner, operator, engineer, <br />contractor with the commissioning authority, <br />was key to facilitating clear and effective <br />communication among all team players, <br />ensuring an effective project turnover. Running <br />on a tight project schedule, Syska's team <br />stayed in constant communication with all <br />other stakeholders to ensure that project goals <br />and deadlines are met. Syska's ccllaborative <br />project approach allowed the team to overcome <br />significant challenges that come adaptively <br />reusing a building originally designed as <br />a single -tenant building, and repurposing it into a <br />sustainable multi -tenant building with an active <br />multi -floor data center and parking garage. <br />Architect <br />RMW Architecture <br />Services Provided <br />Mechanical, Electrical, Plumbing, Sustainable <br />Design, Building Management Systems, <br />Architectural Lighting Design, Energy Services, <br />Commissioning, Fire Narm 1 Life Safety <br />Size <br />40,000 sf <br />Completion Date <br />2013 <br />Construction Cost <br />$32,500,000 <br />2 <br />