Laserfiche WebLink
DocuSign Envelope ID: 1BA90275-0048-437F-ACEC-13F73597F313 <br />y <br />e <br />� <br />_ < a <br />� <br />P <br />a <br />�, eq <br />COUNTY OF SAN DIEGO, PHASE I - URBAN CAMP AT THE <br />JUVENILE JUSTICE CENTER <br />San Diego, California <br />The County of San Diego is in the process <br />Syska is providing electrical engineering and <br />of renovating and rebuilding the existing site <br />architectural lighting design services. <br />and campus at the Juvenile Justice Center. <br />Project Features <br />The new facility represents a shift away from <br />the correctional model of detention and fully <br />• Stand-alone medical unit with general and <br />embraces the positive youth development <br />mental health treatment <br />model. In this model, staff will engage youth <br />• Exceeding Title 24 by at least 20% <br />through the lens of adolescent development and <br />future opportunities. <br />Design -build Entity <br />Phase I of the project includes replacing the girls' <br />Contractor: Balfour Beatty <br />rehabilitation facility and urban camp units with <br />Architect: DLR Group <br />a new 131,000 sf, 128-bed urban camp facility. <br />This phase includes community supervision <br />Services Provided <br />services, juvenile probation center, urban camp <br />Electrical, Architectural Lighting Design <br />setting, and consolidated detention for up to 350 <br />youth and probation administration. The design- <br />Size <br />build project will also include new parking lots, <br />131,000 sf <br />sitework, and a new central plant to serve future <br />phases of the replacement project. Phase 2 will <br />consist of replacing the existing juvenile hall with <br />housing units to accommodate 112 beds. <br />r r� <br />Completion Date <br />2021 Estimated <br />Construction Cost <br />$112,000,000 <br />Sustainability <br />Pursuing LEED Gold <br />Designed for Zero Net Energy <br />