Laserfiche WebLink
prepared, Aqua -Metric will provide a Change Order to Santa Ana for the additional <br />professional services. <br />G. No additional Direct Job Costs (city licenses, permits, etc.) are included and will be invoiced <br />as necessary and on occurrence at cost plus fifteen percent (15%). <br />H. DemobilizationlRemobilization/Stand Down Contingency: The project Mobilization / <br />Demobilization is assumed for a single-phase move on and move off for <br />installation/deployment. If demobilization and remobilization occur during the project due <br />to reasons beyond Aqua -Metric's control, excluding any State or Federal Government <br />mandated suspensions, additional contingency fees will be assessed. <br />i. DemobilizationlRemobilization Fees: Aqua -Metric will invoice for cost plus fifteen <br />percent (15%) to move in and out of market (i.e. travel fees, cancellation fees, vehicle <br />transportation fees.) <br />ii. Stand Down Time: If Aqua -Metric technicians are unable to work during delays or <br />suspensions cause by the City and Concord's resources remain deployed, Aqua -Metric <br />will invoice at $95.00 per hour, per technician for time Aqua -Metric is stood down. <br />I. Traffic Control cost(s) (including but not limited to planning, engineering, permitting, <br />implementation, labor, Traffic Control device setup and removal, etc.) will be invoiced as <br />necessary and on occurrence at cost plus fifteen percent (15%). <br />J. Installation of all materials (meters, radios, or meter retrofits) will not be in confined spaces, <br />vaults, or manholes. Aqua -Metric shall perform 3" through 8" meters in non -permit required <br />confined spaces at no additional cost. Confined space permit required vaults shall require <br />additional resources and equipment, and therefore will result in a cost plus 15%. <br />2 5 H -134 Page 127 <br />