|
JAMES RIOS, PLS
<br />SURVEY PROJECT MANAGER
<br />YEARS OF EXPERIENCE
<br />Total Years 24
<br />With Towill 3
<br />EDUCATION
<br />Various survey related courses completed at the
<br />following:
<br />University of California Riverside, Riverside, CA,
<br />Santiago Canyon College, Orange, CA; and
<br />ITT Technical Institute, Anaheim, CA
<br />REGISTRATION
<br />2011/Professional Land Surveyor/#8823/CA
<br />SPECIALIZED EXPERIENCE
<br />• Specializes in right of way surveys, boundary
<br />surveys, Records of Survey, ALTA preparation,
<br />and encumbrance mapping
<br />• Experienced in preparing topographic design
<br />surveys
<br />• Experienced with data processing and least
<br />squares adjustments
<br />• Excellent working knowledge of Caltrans right
<br />of way engineering, CAD, and survey
<br />standards
<br />• Exceptional safety record
<br />SUMMARY
<br />Mr. Rios has 24 years of professional experience as a Project Manager, Party Chief, and Mapping
<br />Manager. His extensive experience includes performing field calculations, right of way and boundary
<br />surveys, and mapping. He has organized, managed, and executed QA/QC plans and has managed a
<br />broad range of assignments for various projects requiring extensive knowledge of land surveying and
<br />mapping. Mr. Rios routinely supervises the technical work of CAD drafters for the submission of final
<br />drawings, submittals, and specifications for approval. He also oversees and coordinates efforts in all
<br />aspects of land surveying, including research and analysis, title reports, rights of way, easements, ALTA
<br />surveys, topography, and construction staking.
<br />PROJECT EXPERIENCE
<br />Alameda Corridor -East Construction Authority (ACE), Turnbull Canyon Road Grade Separation, City of
<br />Industry, CA:
<br />Mr. Rios is serving as Project Surveyor for the Turnbull Canyon Road Grade Separation project. This
<br />project will separate the roadway and the UPRR tracks by constructing a roadway overpass at Turnbull
<br />Canyon Road between Salt Lake Avenue on the north and Clark Avenue on the south. Towill is
<br />performing design surveys for the project's first phase and will go on to perform construction staking for
<br />the project's second phase. As Project Surveyor, Mr. Rios is responsible for obtaining right of way
<br />permits, establishing horizontal and vertical control, establishing survey control monuments, and
<br />preparing a right of way base map based on cadastral research.
<br />Caltrans District 8, 1-210 at Pepper Avenue, Colton, CA:
<br />As Project Surveyor, Mr. Rios was a part of the team providing right of way engineering survey services.
<br />He was responsible for preparing a land net base map, legal descriptions, and appraisal maps for the
<br />project.
<br />City of Chino, As -needed Land Surveying and Mapping, Chino, CA
<br />Mr. Rios serves as Project Manager for this contract. Towill is providing as -needed land surveying and
<br />mapping services to the City of Chino. The contract's scope of work includes performing research and
<br />data collection, field surveying, right-of-way surveying, construction staking, and monument
<br />Towill, Inc. Resume rfTOWILL
<br />Page 1
<br />SURVEYING 1 MAPPING 1018
<br />25D-310
<br />Appendix Page 19 of 34 1 Clark Land Resources, Inc. (WBE/SB)
<br />
|