JAMES RIOS, PLS
<br />SURVEY PROJECT MANAGER
<br />preservation. Towill was selected as the sole surveying consultant out of 11 proposing firms in late
<br />2018, recently completed our first task order, and will soon begin work on a second task order.
<br />Industry Urban Development Agency, State Route 67/60 Confluence, Phase 2B City of Industry, CA:
<br />Located in the City of Industry, the SR-57/60 Confluence Phase 2B project reconstructed the westbound
<br />State Route 57/60 from Prospectors Road westerly to Grand Avenue and portions of Grand Avenue
<br />north of SR57/60. As part engineering design team, Towill, Inc. is providing land surveying, mapping and
<br />right of way engineering services for the Plans, Specifications and Estimates (PS&E) phase, Topographic
<br />design surveys, and Right of Way engineering services to supportthe acquisition of additional right of
<br />way from four adjacent parcels of the north soled of the project. All the land surveys and deliverables
<br />are performed in accordance with the Caltrans Surveys, CAD and Right of Way Engineering Manuals and
<br />delivered in MicroStation and In Roads formats. Mr. Rios is serving as Project Surveyor.
<br />Orange County Public Works, On -call Land Surveying Services, Orange County, CA:
<br />Mr. Rios serves as Project Surveyor for on -call services being provided to the County of Orange. Services
<br />that can be requested under this contract include boundary surveys, monumentation, monument
<br />preservation, topographic surveys, construction surveys, and other land surveying tasks. Mr. Rios is
<br />currently providing surveying and mapping services for monument preservation for pavement
<br />rehabilitation in the Olive Heights unincorporated area of Orange County. The scope of services includes
<br />monument preservation, horizontal controls, centerline monumentation, pre -construction and
<br />post -construction Corner Records, and submitting daily survey reports to the County.
<br />Riverside County Transportation Commission (RCTC), 1-15/Railroad Canyon Road Interchange
<br />Improvements, Lake Elsinore, CA:
<br />Mr. Rios serves Project Manager for Phase I of the 1-15/Railroad Canyon Road Interchange
<br />Improvements project in Lake Elsinore. This project will reconstruct the northbound ramps, widen the
<br />southbound on -ramp to three lanes, widen Railroad Canyon Road to eight lanes, install meters on the
<br />on -ramps, construct northbound deceleration lane, and an acceleration lane at the on -ramps. Towill is
<br />providing design surveys, right of way engineering services, and construction design support.
<br />San Bernardino County Transportation Authority (SBCTA), 1-15/Baseline Road Interchange, Rancho
<br />Cucamonga, CA:
<br />Mr. Rios served as a Project Surveyor for this SBCTA interchange project. Towill provided full
<br />construction survey support services, including monument preservation and perpetuation, construction
<br />staking, horizontal and vertical control, as -built surveys, and right of way surveys. The project
<br />improvements consisted of reconstructing the interchange as a partial cloverleaf configuration, the
<br />northbound on ramp was modified to two lanes to receive dual leftturn lanes from the eastbound
<br />Baseline Road, and the southbound off -ramp was reconstructed as a two-lane exit at 1-15 to expand to a
<br />four -lane ramp at its terminus at Baseline Road. In addition, two new bridges and one bridge widening
<br />were required.