Laserfiche WebLink
JAMES RIOS, PLS <br />SURVEY PROJECT MANAGER <br />preservation. Towill was selected as the sole surveying consultant out of 11 proposing firms in late <br />2018, recently completed our first task order, and will soon begin work on a second task order. <br />Industry Urban Development Agency, State Route 67/60 Confluence, Phase 2B City of Industry, CA: <br />Located in the City of Industry, the SR-57/60 Confluence Phase 2B project reconstructed the westbound <br />State Route 57/60 from Prospectors Road westerly to Grand Avenue and portions of Grand Avenue <br />north of SR57/60. As part engineering design team, Towill, Inc. is providing land surveying, mapping and <br />right of way engineering services for the Plans, Specifications and Estimates (PS&E) phase, Topographic <br />design surveys, and Right of Way engineering services to supportthe acquisition of additional right of <br />way from four adjacent parcels of the north soled of the project. All the land surveys and deliverables <br />are performed in accordance with the Caltrans Surveys, CAD and Right of Way Engineering Manuals and <br />delivered in MicroStation and In Roads formats. Mr. Rios is serving as Project Surveyor. <br />Orange County Public Works, On -call Land Surveying Services, Orange County, CA: <br />Mr. Rios serves as Project Surveyor for on -call services being provided to the County of Orange. Services <br />that can be requested under this contract include boundary surveys, monumentation, monument <br />preservation, topographic surveys, construction surveys, and other land surveying tasks. Mr. Rios is <br />currently providing surveying and mapping services for monument preservation for pavement <br />rehabilitation in the Olive Heights unincorporated area of Orange County. The scope of services includes <br />monument preservation, horizontal controls, centerline monumentation, pre -construction and <br />post -construction Corner Records, and submitting daily survey reports to the County. <br />Riverside County Transportation Commission (RCTC), 1-15/Railroad Canyon Road Interchange <br />Improvements, Lake Elsinore, CA: <br />Mr. Rios serves Project Manager for Phase I of the 1-15/Railroad Canyon Road Interchange <br />Improvements project in Lake Elsinore. This project will reconstruct the northbound ramps, widen the <br />southbound on -ramp to three lanes, widen Railroad Canyon Road to eight lanes, install meters on the <br />on -ramps, construct northbound deceleration lane, and an acceleration lane at the on -ramps. Towill is <br />providing design surveys, right of way engineering services, and construction design support. <br />San Bernardino County Transportation Authority (SBCTA), 1-15/Baseline Road Interchange, Rancho <br />Cucamonga, CA: <br />Mr. Rios served as a Project Surveyor for this SBCTA interchange project. Towill provided full <br />construction survey support services, including monument preservation and perpetuation, construction <br />staking, horizontal and vertical control, as -built surveys, and right of way surveys. The project <br />improvements consisted of reconstructing the interchange as a partial cloverleaf configuration, the <br />northbound on ramp was modified to two lanes to receive dual leftturn lanes from the eastbound <br />Baseline Road, and the southbound off -ramp was reconstructed as a two-lane exit at 1-15 to expand to a <br />four -lane ramp at its terminus at Baseline Road. In addition, two new bridges and one bridge widening <br />were required. <br />Towill, Inc. Resume rfTOWILL <br />Page 2 <br />SURVEYING 1 MAPPING 1018 <br />25D-311 <br />Appendix Page 20 of 34 1 Clark Land Resources, Inc. (WBE/SB) <br />