My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:53:30 AM
Creation date
4/28/2021 2:02:49 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
N-2021-079
Agency
Public Works
Expiration Date
3/24/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />UNDERSTANDING OF NEED <br />TASKS NECESSARY FOR SUCCESSFUL COMPLETION <br />Kick-off meeting with City staff and other appropriate people to better understand their needs / concerns as it pertains to this irrigation <br />renovation and future maintenance/operation of the new system. <br />Conduct thorough site visit making inventory of existing irrigation equipment and plant material that may be impacted by the <br />proposed trenching and install of new irrigation, and getting accurate photos of existing conditions. <br />• A thorough review of existing as-builts relevant to the site. Particularly existing wet and dry utilities that run through the park so we <br />can make sure the General Contractor who performs the installation work won't encounter any surprises once they break ground. <br />• Verify available water pressure at the POC. This is critical info for designing the new turf rotor layouts and valving out the new <br />system. In talking with the City Water Department in preparing this response we learned that latest records indicate that static water <br />pressure at the park is between 85 and 90 psi. That is plenty of PSI to run and operate a new system for the park with 24 valves. <br />Coordination with electrical engineer to determine how best to run new conduit to new controller location within the structure. <br />Productive meetings with City and staff during review sessions that identify weaknesses in the design or in the construction plans so <br />we can constantly be refining the plans to a point of absolute clarity. <br />Proper selection of new irrigation products and devices. You're looking to install new rotors and spray heads along with a new <br />controller, We can help sift through the options and take advantage of the latest technologies. <br />There are a few areas where you will need selection of new plant material and we can provide that as part of our construction <br />document package as well. <br />Well -coordinated construction plans that clearly indicate the intended scope, from what has to be removed to what is to be built in <br />its place. <br />EXCLUSIONS <br />Any type of Environmental engineering related services <br />• Traffic study <br />LEED certification design or documentation <br />Preparation of rendered site plans for further project promotion or presentation purposes <br />Design of storm water quality BMPs & LID <br />• Any other service not specifically mentioned in the RFP or this proposal <br />710 CITY OF SANTAANA: RFP NO 20-128 <br />CABRILLO PARK IRRIGATION RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.