My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2024 9:53:30 AM
Creation date
4/28/2021 2:02:49 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
N-2021-079
Agency
Public Works
Expiration Date
3/24/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />REFERENCES <br />ROOSEVELT ELEMENTARY SCHOOL MODERNIZATION <br />Little was contracted by the Pomona Unified School District to provide Master Planning and final A/E <br />design services for the revitalization of the campus at Roosevelt Elementary School. <br />The final design involves implementation of (3) separate phases to completely remake the entire <br />campus. In Phase #01, (19) existing portable classroom buildings will be replaced with two (2) new, <br />Two -Story Pre -Fast classroom buildings. In Phase #02, the existing school building itself will undergo <br />an exciting modernization effort. And in Phase #03, the rest of the site will be renovated. While respect <br />to the historic site walls, the parking lot and drop off areas will be reorganized. Acquisition of an <br />adjacent parcel will allow for the total parking count to be expanded, <br />The final site layout being prepared by Little's Land Development Studio also included new play <br />equipment, shade structures, outdoor classrooms, hard -courts, and a sports field. They also applied <br />various L.I.D. techniques to address storm water treatment and capture on -site. Additionally, a new <br />irrigation system had to be designed for the (6) acre site, combining the front of the project with the <br />back of the project into one P.O.0 and one smart controller. Construction was done in phasing so <br />irrigation was designed to allow for portions of existing to remain while other portions were removed <br />and new irrigation was installed. <br />13 CITY OF SANTA ANA: RFP NI2U-120 <br />CABRILLO PARK IRRIGATION RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.