My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:31:05 PM
Creation date
5/6/2021 12:26:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
A-2021-059
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/19/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />UNDERSTANDING OF NEED <br />Quality Control - Like any design firm we understand that <br />we're only as good our projects, and those are only as good <br />our drawings. During the design and construction document <br />phase we will have our own internal team schedule for each <br />discipline. They will be required to provide us their drawings <br />ahead of any city submittal so that our in-house design <br />team can review and provide redline comment back prior <br />to said submittal. In addition, our internal QAQC team will <br />scan the drawing sets at each milestone submittal for errors, <br />omissions, coordination issues, etc. Ourexpertise in detailing <br />and construction processes will help us anticipate issues <br />that could be discovered in the field so we can update the <br />drawings to reflect all the scope required by the contractor. <br />vii. Suggestions / Special Concerns — We're just <br />coming into this project so we still have a lot of catching up to do. <br />The City and it's Staff has been dealing with the site for some time <br />so we understand there is a mountain of things we're not up to <br />speed on regarding the history of the project and the history of the <br />concept that was used to secure the grant money. We make the <br />following suggestion based purely on what we saw during our site <br />visit and our understanding of what the City finds exciting about <br />this project. The overlook deck and triangle site is mostly intended <br />to be a rest stop for bikers that are using the extensive Santa Ana <br />River Trail System. We think the current layout of the deck misses a <br />great opportunity to make this intent more clear. The current triangle <br />shape is a reflection of the property lines which are a bit arbitrary. <br />Its nice that the deck extends out into the landscape area as an <br />overlook but it doesn't connect well with it's surrounding. Just on the <br />other side of the bike trail is a huge steel frame and wood bridge, <br />spanning 30OFT and making a connection across the channel to <br />Edna park and existing residential. In terms of scale, this is the most <br />interesting thing happening in the area. We think having the layout <br />of the re -built deck react directly to the bridge makes more sense <br />and will create a more meaningful stopping point. This would give <br />users a chance to sit and watch passersby on the bike path and view <br />the bridge and channel as well. They may not be the prettiest thing <br />in the world, but the bridge and channel are feats of engineering <br />and the scale of both is eye catching. A portion of the deck can still <br />extend out into the riparian landscape but with a change in how <br />the deck abuts the edge of the bike path can make it more open, <br />inviting, and feel more connected to its surroundings. We've taken <br />the liberty of providing a sketch of what this Could look like. <br />BECAUSE DECK IS <br />ELEVATED ABOVE FINISH <br />GRADE, ITALLOWS FOR <br />SPECIMEN TREES TO <br />BE PLANTED CLOSE TO <br />THE EDGE AND PROVIDE <br />A CONTINUOUS EDGE <br />ALONG THE BIKE PATH <br />LIKE THIS ALLOWS FOR <br />MORE INVITING PULL IN <br />FOR BIKERS TRAVELLING <br />NORTH AND SOUTH <br />ALONG THE EAST SIDE <br />OFTHECHANNEL <br />A CONTINUOUS EDGE <br />ALONG THE BIKE <br />PATH ALSO PROVIDES <br />OPPORTUNITIES FOR - ? <br />SEATING THAT VIEWS THE <br />BIKE PATH AND BRIDGE/ i <br />CHANNEL WITH THE PARK <br />AND MOUNTAINS IN THE r <br />n- <br />SHAPE OF DECK CAN BE AN <br />EXTENSION OF THE EXISTING <br />BRIDGE THAT SPANS THE <br />CHANNEL THIS CREATES A <br />BETTER VISUAL RELATIONSHIP <br />FOR THOSE COMING TO THE <br />SITE FROM EDNA PARK. <br />BECAUSE DECK IS <br />ELEVATED ABOVE <br />FINISH GRADE, <br />IT ALLOWS FOR <br />SPECIMEN TREES <br />TO BE PLANTED <br />CLOSE TO THE <br />EDGE AND PROVIDE <br />SEATING AREAS. <br />LARGE BOULDERS PLACED <br />BENEATH NEW DECK DETER <br />ENCAMPMENTS BECAUSE <br />NO LEVEL GROUND FOR <br />SPREADING OUT TENT. <br />15 <br />CITY OF SANTA ANA: RFP NO: 20130 <br />17TM STREET TRIANGULAR PARK RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.