My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Clerk
>
Contracts / Agreements
>
L
>
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC. (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/6/2021 12:31:05 PM
Creation date
5/6/2021 12:26:46 PM
Metadata
Fields
Template:
Contracts
Company Name
LITTLE DIVERSIFIED ARCHITECTURAL CONSULTING, INC.
Contract #
A-2021-059
Agency
Public Works
Council Approval Date
4/20/2021
Expiration Date
4/19/2024
Insurance Exp Date
1/1/1900
Destruction Year
2029
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATEMENT OF QUALIFICATIONS <br />UNDERSTANDING OF NEED <br />TASKS NECESSARY FOR SUCCESSFUL COMPLETION <br />Foot survey locating all existing elements horizontally and vertically. <br />Geotechnical Report for existing soils condition to perform structural calculations. <br />Starting coordination with utility company early on so electrical power is coordinated and installed when site lighting is ready for <br />installation. <br />Kick-off meeting with City staff and other appropriate people to better understand their needs / concerns as it pertains to access and <br />maintenance of the site. <br />Conduct thorough site visit making inventory of existing plant material and getting accurate photos of existing conditions and join <br />edges. <br />A thorough review of existing as-builts relevant to the site. Particularly existing wet and dry utilities that run through and/or adjacent <br />to the work area. <br />Productive meetings with City and staff during review sessions that identify weaknesses in the design or in the construction plans so <br />we can constantly be refining the plans to a point of absolute clarity. <br />Proper selection of site materials and finishes that allow the vision for the project to be realized while remaining in budget. <br />Proper selection of plant material that fits the landscape areas created with the final design. <br />Proper selection of appropriate irrigation systems based on final plant selection and the landscape areas created by the final design. <br />Well -coordinated construction plans that clearly indicate the intended scope, from what has to be removed to what is to be built in <br />its place. <br />Getting plans permitted with OCFCD and Department of Environmental Health <br />ASSUMPTIONS AND EXCLUSIONS <br />Obtaining title report from title company and Preparation and recordation of any type of easement and dedication <br />Underground utility survey <br />Any type of Environmental Engineering related services such as but not limited to CEQA,EIR & NEGDEC. <br />Traffic study <br />LEED certification design or documentation <br />Preparation of rendered site plans for further project promotion or presentation purposes beyond what will be prepared during the <br />DD phase. <br />Any major lay -out and design changes after DD approval. It is understood that we are required to address comments and revisions <br />throughout the CD <br />Hydrology study and hydraulic analysis for site <br />Design of storm water quality BMPS (WQMP), and channel protection devices or structures <br />Any other service not specifically mentioned in the RFP or this proposal <br />76 CITY OF SANTAANA: RFP NO 20-130 <br />17T" STREET TRIANGULAR PARK RESTORATION <br />
The URL can be used to link to this page
Your browser does not support the video tag.