STATEMENT OF QUALIFICATIONS
<br />RELEVANT PROJECT EXPERIENCE
<br />CLIENT / PROJECTNAME LOCATIONYEAR
<br />•
<br />Adventist Health West, Headquarters & Building Roadway Plan
<br />Roseville, CA
<br />New 5 story Adventist Health Headquarter building project at City of Roseville. The headquarter
<br />building consists of two five story bars joined by an atrium. The narrow bars ensure that the workplace
<br />is filled with daylight and views of the beautiful gardens and surrounding hills. The ground floor
<br />contains a large lobby, grand piano atrium, conference center, dining room and food service area,
<br />City of Roseville
<br />movement instruction room and lab, showers and lockers, and medical practice. Scope of work
<br />Matthew Todd
<br />included parking areas for nearly 300 cars, pedestrians connections to public sidewalk wrapping the
<br />Senior Engineer
<br />2018
<br />site and a fitness trail that winded through the site with a number of fitness stations for employees and
<br />916.774.5562
<br />public use. Two garden areas flank the building to provide relaxing outdoor spaces with multiple water
<br />mtodd@roseville.ca.us
<br />features and a large faux -rock water fall facing the main street. A 96" box, Legacy Oak, welcomes
<br />visitors in the entry courtyard, and is enhanced by a medicinal herb and healing garden. Storm water
<br />quality is treated with a series of bioretention areas across the campus, and the entire landscape
<br />utilizes California native plantings to embrace it's surroundings and lead by setting the example for
<br />future developments in the area.
<br />Cabrillo Highschool & Wilson Highschool Track and Field
<br />Long Beach, CA
<br />Awarded to provide architectural / engineering services to include Architecture, Civil Engineering
<br />Erin Scott -Keith
<br />Landscape Architecture, and Electrical Engineering for the complete design, construction documents,
<br />Project Manager
<br />approvals, bidding, and construction administration for this project. The project included upgrading
<br />Facilities Development
<br />201E
<br />existing grass football/soccer field and DIG running track with new synthetic surfaces and equipment at
<br />& Planning
<br />(2) High schools for Long Beach Unified School District. It also included paving improvement around
<br />562.997.7550
<br />the track and at accessible paths, new fencing and gates, storm drainage improvements, and water
<br />cannon irrigation system for the field.
<br />MiraCosta Community College San Elijo Campus: Student Services Building
<br />Encinitas, CA
<br />MiraCosta Community College District's San Elijo Campus New Student Services & Administration
<br />Pain Karakas
<br />kas
<br />Building project will provide a new gateway and be the face of the San Elijo Campus. It will replace
<br />PEED AP, BIA
<br />the existing Administration Building and consolidate all of the student services operations under one
<br />Sr. Project Manager
<br />roof. The new building will provide administrative offices, such as admissions meeting spaces, the
<br />SEC & Cct Campus
<br />Admin/Student Services Growth department, bookstore and storage/receiving, healthcare center and
<br />Manager
<br />Under
<br />exam room, among others, that will allow staff to properly serve the student body. As the first new
<br />3333 Manchester
<br />Manchester
<br />ster Ave.A
<br />Construction
<br />construction project under Measure MM on the San Elijo College Campus, the Student Services &
<br />Cardiff, C 920
<br />Administration Building is a great first step in achieving the overall goals of the District. This project not
<br />7diff,
<br />only will modernize services and enhance the overall experience for students and visitors, it will also
<br />rfavis@cccd.edu
<br />be right sized, well designed, and act as the new gateway and face of the campus. It will become the
<br />beacon of the community and attract a larger enrollment, while providing an intimate internal outdoor
<br />courtyard.
<br />Glendale Community College Verdugo Gym Replacement
<br />Glendale, CA
<br />The project includes a new 40,000 SF two-story gym building and new restroom/concession
<br />building. As lead landscape architect on the project, Little generated design alternatives for various
<br />Joel Peterson
<br />site amenities such as new entry plaza, amphitheater, and outdoor exercise yard. This included
<br />Director of Facilities
<br />Under
<br />reconfiguring and existing parking to maximize capacity and provide accessibility to all new facilities.
<br />818.240.5222
<br />Construction
<br />Also included final design selection for hardscape materials such as decorative paving materials, steel
<br />jeterson@glendale.edu
<br />railings, and conceptual site lighting design. Complete planting and irrigation design and construction
<br />for all new planting areas including upgrades to existing irrigation system and selection of drought
<br />tolerant, low water use trees, shrubs and ground covers.
<br />17 CITY OF SA NTA ANA: RFP NO.20130
<br />WI STREET TRIANGULAR PARK RESTORATION
<br />
|