Laserfiche WebLink
STATEMENT OF QUALIFICATIONS <br />RELEVANT PROJECT EXPERIENCE <br />CLIENT / PROJECTNAME LOCATIONYEAR <br />• <br />Adventist Health West, Headquarters & Building Roadway Plan <br />Roseville, CA <br />New 5 story Adventist Health Headquarter building project at City of Roseville. The headquarter <br />building consists of two five story bars joined by an atrium. The narrow bars ensure that the workplace <br />is filled with daylight and views of the beautiful gardens and surrounding hills. The ground floor <br />contains a large lobby, grand piano atrium, conference center, dining room and food service area, <br />City of Roseville <br />movement instruction room and lab, showers and lockers, and medical practice. Scope of work <br />Matthew Todd <br />included parking areas for nearly 300 cars, pedestrians connections to public sidewalk wrapping the <br />Senior Engineer <br />2018 <br />site and a fitness trail that winded through the site with a number of fitness stations for employees and <br />916.774.5562 <br />public use. Two garden areas flank the building to provide relaxing outdoor spaces with multiple water <br />mtodd@roseville.ca.us <br />features and a large faux -rock water fall facing the main street. A 96" box, Legacy Oak, welcomes <br />visitors in the entry courtyard, and is enhanced by a medicinal herb and healing garden. Storm water <br />quality is treated with a series of bioretention areas across the campus, and the entire landscape <br />utilizes California native plantings to embrace it's surroundings and lead by setting the example for <br />future developments in the area. <br />Cabrillo Highschool & Wilson Highschool Track and Field <br />Long Beach, CA <br />Awarded to provide architectural / engineering services to include Architecture, Civil Engineering <br />Erin Scott -Keith <br />Landscape Architecture, and Electrical Engineering for the complete design, construction documents, <br />Project Manager <br />approvals, bidding, and construction administration for this project. The project included upgrading <br />Facilities Development <br />201E <br />existing grass football/soccer field and DIG running track with new synthetic surfaces and equipment at <br />& Planning <br />(2) High schools for Long Beach Unified School District. It also included paving improvement around <br />562.997.7550 <br />the track and at accessible paths, new fencing and gates, storm drainage improvements, and water <br />cannon irrigation system for the field. <br />MiraCosta Community College San Elijo Campus: Student Services Building <br />Encinitas, CA <br />MiraCosta Community College District's San Elijo Campus New Student Services & Administration <br />Pain Karakas <br />kas <br />Building project will provide a new gateway and be the face of the San Elijo Campus. It will replace <br />PEED AP, BIA <br />the existing Administration Building and consolidate all of the student services operations under one <br />Sr. Project Manager <br />roof. The new building will provide administrative offices, such as admissions meeting spaces, the <br />SEC & Cct Campus <br />Admin/Student Services Growth department, bookstore and storage/receiving, healthcare center and <br />Manager <br />Under <br />exam room, among others, that will allow staff to properly serve the student body. As the first new <br />3333 Manchester <br />Manchester <br />ster Ave.A <br />Construction <br />construction project under Measure MM on the San Elijo College Campus, the Student Services & <br />Cardiff, C 920 <br />Administration Building is a great first step in achieving the overall goals of the District. This project not <br />7diff, <br />only will modernize services and enhance the overall experience for students and visitors, it will also <br />rfavis@cccd.edu <br />be right sized, well designed, and act as the new gateway and face of the campus. It will become the <br />beacon of the community and attract a larger enrollment, while providing an intimate internal outdoor <br />courtyard. <br />Glendale Community College Verdugo Gym Replacement <br />Glendale, CA <br />The project includes a new 40,000 SF two-story gym building and new restroom/concession <br />building. As lead landscape architect on the project, Little generated design alternatives for various <br />Joel Peterson <br />site amenities such as new entry plaza, amphitheater, and outdoor exercise yard. This included <br />Director of Facilities <br />Under <br />reconfiguring and existing parking to maximize capacity and provide accessibility to all new facilities. <br />818.240.5222 <br />Construction <br />Also included final design selection for hardscape materials such as decorative paving materials, steel <br />jeterson@glendale.edu <br />railings, and conceptual site lighting design. Complete planting and irrigation design and construction <br />for all new planting areas including upgrades to existing irrigation system and selection of drought <br />tolerant, low water use trees, shrubs and ground covers. <br />17 CITY OF SA NTA ANA: RFP NO.20130 <br />WI STREET TRIANGULAR PARK RESTORATION <br />