My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-03-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
FULL AGENDA PACKET_2021-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 11:27:07 AM
Creation date
7/8/2021 4:07:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/16/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Klmley)))Horn <br />arner Avenue Protected Bike Cane (Oak Street to Grand Avenue) PS C211712021 <br />RFP NO. 70,..094 <br />The Kimley-Horn Team will also provide vacuum excavation potholes to positively identify utilities where <br />conflicts may exist. This task entails up to 3 potholes with a depth up to 15 feet. Additional potholes, if <br />needed, will be an optional item per each pothole. We assume traffic control for potholing will be based <br />on WATCH manual. Preparation of traffic control plans is excluded from this task. It is assumed that field <br />potholing operations will be performed and completed within a one -day period. <br />Deliverable. IWellrveeS1ation Wfl If:ilIes of..i..opogirallphl lay Survey a:inci 14lofllmud e Data IGReport <br />Task 4: Water Quality Management Plan <br />Kimley-Horn will update the Water Quality Management Plan (WQMP) for the project in compliance <br />with, and meeting the requirements of, Order No. R8-2009-0030 (Amended by R8-2010-0062), of the <br />Santa Ana Regional Water Quality Control Board. The WQMP will incorporate Low Impact Development <br />(LID) Best Management Practices (BMP) to the Maximum Extent Practical (MEP). Based on our <br />preliminary research traditional LID BMPs cannot be incorporated. Therefore, appropriate proprietary <br />BMPs will be selected to improve water quality. If proprietary items are needed, these will be indicated <br />in compliance with the City's adopted public contracting code. We will address one round of <br />consolidated City comments before preparing the final deliverable. <br />Deelleu.rnbl s: Dt a��t on°naf Final Vll teen �":f,n�aolity h4anea,age��nrn en°nt. Plan <br />� rc <br />Task 5: Street Improvement Plans <br />The Kimley-Horn will develop a street improvement plan for the construction of the protected bike lane <br />within the project limits. The plans will show typical sections, details and horizontal and vertical (where <br />needed) design information. Roadway plans will be prepared at a scale of 1" = 20' horizontal and 1"=2' <br />vertical. Vertical design information will be shown on plans with elevation call outs for details where not <br />shown on profiles. We assume the City will provide one set of consolidated comment for each submittal. <br />Defivera1°:Ies: '30 and :i.Ct"D°/ f`1arias, elay ctiro i n'dc iillles fin 1 1 cir:::Stadoin \lflll and (�i`fumnA Ir Ilaln s w illlll be scaled <br />and �rll .N II Ile':"e as lrnd u"e, vpKan"n�roE" S tO re �aQe.n9.a.a II ene9ne':"1�9 Q'o1ellimee�nts °f Iron i the. ��.,, <br />a la v rr a a• � a rc� 7 r f'a .,.��,y. <br />Task 6: Signing and Striping Plans <br />Kimley-Horn will prepare striping and signing plans at a scale of 1" = 40' for the proposed improvements <br />within the limits of the project. Signing and striping plans are limited to bikeway delineation. These will <br />comply with City's standards, Caltrans, and the California MUTCD. <br />Deliverables: 30% n)ine :i.lttt% f anns, e.7 e clue:au'nic it eyes alum Kcii(,)tttaaq:ioin \ll'lll aaind II-aliull�fiu"nne lfllains it .nee se a c., <br />and °rllg ne,el(, aalr d Ire srrcl uoi nse s to previous II e vk:,,\At corrrnll„aneelrnt's fllmeuaun t11he City, <br />Task 7: Opinion of Probable Construction Cost <br />Kimley-Horn will prepare an Opinion of Probable Construction Cost (Estimate) based on quantities, for <br />comparison to project budget and assistance during the Contractor's bidding process. Unit prices will be <br />derived from readily available current bid information based on similar projects within the area. Backup <br />will be generated for lump sum items. <br />Deeliveeaeables:.100i/ f.11l")a irnlioi n of 6�)irol,�na'ablle:" Co nstal'u ctidanlrn e.eaan�ts, eeUeectronie fillenea Ulan lPD16 <br />Task 8: Specifications <br />City Council 25 - 18 3/16/26n 2 of a <br />
The URL can be used to link to this page
Your browser does not support the video tag.