My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-03-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
FULL AGENDA PACKET_2021-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 11:27:07 AM
Creation date
7/8/2021 4:07:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/16/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Check and use boiler viewpodto check main burner flame asrequired, <br />5. Turn off and secure boiler onrequired. <br />8. Check boilers for any unusual noise orvibration aorequired. <br />7. Inspect gaskets for any signs ofleaks earequired. <br />8. Examine the venting system unrequired. <br />&. Remove and /ur inspect gas pilot anmemb|y, reinstall in accordance according to <br />factory specifications and tolerances. <br />10, Check boiler circulating pumps for proper operation and lubricate as required. <br />11. Check flame safeguard control for pilot and main flame ignition anrequired. <br />12. Check operation nfblower motor and circuitry aarequired. <br />13, Check operation ofgas valves and vents anrequired. <br />14. Inspect and tighten all electrical connections oorequired <br />15. Check and adjust all boiler limit pressure controls and running interlocks as required. <br />16. Check operation and adjust low water controls anrequired. <br />17. Check burner, pilot and main flame ignition as required. <br />18, Check and oil combustion air fan aorequired. <br />10. Check expansion tank and site glass aerequired <br />20. Check and record all entering and leaving water temperatures and pressures as required <br />21. The equipment room shall be left in the same clean condition as existed prior to start of <br />the work. <br />22. Refer toequipment O&M manual for any maintenance clarifications. <br />Cooling Tower: <br />1. Provide four (4) quarterly inspections and maintenance. <br />2. Preventive maintenance oorequired. <br />3. Lock -out and Tag -out equipment ao required, <br />4 Check starter contacts for excessive wear anneeded. <br />5. Tighten all starter wire connections. <br />S. Check gear reducer and couplings. <br />7. Meg -Ohm motor and VFD'a. <br />8. Check fan balance and motnr(n)amps. <br />9. Clean and lubricate unit motor bearings and fan blades. <br />10. Check operation ofmedia and flow. <br />11, Lubricate all dampers and linkages aonecessary. <br />Chilled Water Pumps <br />1. Check pump and motor operation. <br />2. Check fault history report aorequired. <br />3. Check and operate bypass valves. <br />4. Checks and verify strainers for optimum flow. <br />5. Check and tighten all electrical connections oarequired <br />S. Check starter contacts for wear anrequired. <br />7. Check and record motor amp. <br />8. Luboand grease motor bearings aoneeded. <br />Johnson Controls: <br />1. Inspect and repair NCU1hoNCU12for optimum operations. <br />2. Inspect and repair anneeded 21air handler controls and 4GVFD. <br />3. Inspect all damper motors controls and set points. <br />City Council <br />;&m6mpj3O <br />3/16/2021 <br />&oouy; <br />
The URL can be used to link to this page
Your browser does not support the video tag.