My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET_2021-03-16
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
03/16/2021 Regular
>
FULL AGENDA PACKET_2021-03-16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/8/2025 11:27:07 AM
Creation date
7/8/2021 4:07:17 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
3/16/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
725
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6. Check unit pressures and record as required <br />Chiller with Reciprocating Compressors <br />1. Provide annual vibration analysis for two CDYork Chillers. <br />Z Provide annual leak test for two C8York Chillers. <br />l Provide four (4) quarterly inspections and maintenance for two (2) York Chillers. <br />4. Provide chiller controls coolant for two (2)York Chillers <br />3. Visually inspect equipment condition and operation oorequired. <br />4. Check for unusual vibration, noise, excessive temperatures & refrigerant leaks as <br />required. <br />5. Check unit voltage and record ourequired. <br />6. Check unit operate and records eyrequired, <br />7 Check unit operating hours and record onrequired. <br />8. Check condenser pressure and record oorequired. <br />Q. Check evaporator pressure and record anrequired. <br />10. Check oil sump sight glass osrequired. <br />11. Record chilled water inlet temperature. <br />12, Record chilled water outlet temperature oorequired. <br />13. Check condenser water inlet enrequired. <br />14. Check condenser water outlet temperature oorequired. <br />15. Check compressor starter contacts for abnormal wear amrequired. <br />Variable Frequency Drive: <br />Check unit operation quarterly aerequired. <br />Check fault history report uarequired. <br />Check operation ofmanual bypass anrequired. <br />Verify drive signal increase and decrease aurequired. <br />Check and tighten all electrical connections osrequired. <br />Check starter contacts for wear anrequired, <br />Computer Room Air Conditioning Units: <br />1. Check all electrical wiring and connection merequired. <br />2. Check and replace filters oorequired. <br />3. Check all electrical wiring and connections; tighten oorequired. <br />4. Check starter contactor surfaces for wear oarequired, <br />5. Check compressor amps and record aarequired. <br />8. Check sight glass for moisture level oarequired. <br />7. Check operation ofcrankcase heater aorequired. <br />8. Lubricate condenser fan motor and fan bearings aorequired. <br />Q. Check condition ofcondenser coil, clean aorequired. <br />10. Check belts for wear, replace ourequired. <br />11. Check and adjust compressor capacity controls oorequired. <br />12 Lubricate indoor fan motor and bearings aarequired. <br />13, Check humidifier for proper operation norequired. <br />Boilers: <br />1. Provide annual Preventive Maintenance Inspection ontwo (2)Bryan Boilers. <br />2. Provide annual Preventive Maintenance Inspection on four (4) Hot Water Boilers. <br />3. Check boilers for proper operation aorequired. <br />City Council <br />;&m6mpj29 <br />3/16/2021 <br />&oouy; <br />
The URL can be used to link to this page
Your browser does not support the video tag.