Laserfiche WebLink
• Vedeslrian Bridge to complement existing pedestrian bridge over week <br />• Concrete Walkways with decorative score line pattern <br />• Decomposed C:ranile walkways with split rail Fencing around landscape areas <br />• California Native/Riparian landscaping, butterfly garden, including trees, plant <br />identification signagc <br />• Sitc and Vicwing Dcck Lighting <br />• Automatic irrigation system <br />• Sitc Amenities, including interpretive signage, intomiation board/kiosk, [arches, picnic <br />tables, bike racks <br />• Drainage which utilizes "Low Impact Development" concepts with goat for Hill site <br />infiltration. <br />• Asphalt Bike Trail to minor existing trial along hike path <br />The improved area is to he utilized by Santiago Park Wildlife and Watershed Center local <br />residents, bicyclist, joggers and visiting patrons from the Discovery Museum and by various <br />programs eomducted by the Santa Aim Parks, Recreation and Community Service stall' <br />The City will pursue grant Ilnding for this project and expects the total Project Budget to he <br />approximately S-1 mil. <br />Consultant Responsibilities: <br />The Consultant's responsibilities include the following, and shall consist of the_follotring project <br />tasks: <br />Consultant is responsible for providing all design and engineering as required lor all components <br />within the project scope of work. This includes, but is not limited to, survey, civil engineering, <br />gcotechnical investigation and roport (tor soils analysis), infiltration testing, elcetneal engineering. <br />C'onsttltarrt will also be responsiblec for facilitating up to 3 meetings with City Staff to obtain input and <br />finalize concept plan. <br />COn]tlhatnt shall provide review sets in _pdf tormat. <br />Final plans shall be provided in AuIoCAD or Microstation lormat, and .pol' lonnat- <br />Task 1: Pre -Design <br />Preliminary design shall include Kick-oll'mecting with City Staff w discuss scope of work, project <br />goals and objeclives, potential elements and issues and schedule. Pre -Design will also include up to <br />3 meetings with City Statf' (facilitated by consultant) to obtain input and finalize concept plan. <br />r Dclivciables shall include up to 3 rendered concept plans, which incorporate City Staff input <br />and provide basis for discussion at meetings. <br />Y Final Concept shall he approved by Cily Slafl' <br />City Council City of Santa Ana FjFW2()f454 5/18/2021 <br />Page Al-2 <br />