Laserfiche WebLink
Task 2. /)esign Development (50%plans) <br />Design development will involve the schematic development of plans based upon the approved <br />conceptual design plan, which shall include arcliaCCILItal, landscape arehitcetural, civil engineering, <br />and electrical engineering (including photometrics), drab technical specifications and "opinion of <br />estimated cost'. <br />- Deliverables shall inchtde a 50'/o set of plans, draft specification and "Opiuiou of Probable <br />Cost'. <br />Task 3: Construction Docrrmerrts (90% rrrrd 100% plans) <br />Construction Documents (('Ds) shall include tinalizing approval dcliventblcs tiY111 the Design <br />Development phase. 'Phis includes the provision of detailed engineering and constntction drawings <br />that will serve as the hasis for both bidding and construction by a general contractor. <br />➢ Deliverables shall include 90% and 100'/o plans, final technical specifications, and a finalized <br />..Opinion of Probable C'ost"- <br />Plans shall include, but are not limited to the following: <br />• Tide Shea <br />• Civil Lngincering <br />o Sitc I•rosion Phut <br />o Parking Lot at Main street with (late, bollards <br />o Bikc Trtil <br />o PCdCStflan Bridge <br />c� Viewing Deck with seating area <br />n Park si-Inage <br />o CUnCrCLC Walkways <br />o Decomposed Gnmitc Walkways <br />o Horizontal and Vertical Control Plan <br />o Grading And On -Site Drainage Plan <br />0 Site Utility flan <br />• Landscape Architectural <br />o Sitc Latyout/Construction Plans And Dctails <br />o Site Sections, as applicable <br />o Planting Plans/DetaiLJNotes <br />o Inigation Plan s/Dctails/('a]culati oils/Notts <br />• l-.lectrical <br />o Elcciical Site Plan, including lighting, clee rical outlets <br />o Photomctrics <br />o Location of panels, switchgear, meters <br />o Schedules <br />o Detail, <br />o Notes, specifications <br />City Council City of Santa Ana FJW20i-554 5/18/2021 <br />Page Al-3 <br />