Laserfiche WebLink
1. INTRODUCTION / PROJECT DESCRIPTION <br />Nature ol' Work: <br />The City of Santa Ana is seeking qualified contractors to perform spill response, <br />hazardous waste disposal, and storm drain facility maintenance services. A detailed <br />Scope of Worl< N included in the Appendix of this RFP as Attachnn:nt 1- <br />Number of Proposals and Signature: <br />Proposals must he submitted electronirrlly throunh the Planett3ids system. No other <br />[Linn of ubtnittal will be accepted. It is the responsibility of the proposer to ensure <br />that any proposals submitted have been uploaded to Planetl3ids prior to the proposal due <br />date and time stated on the cover pace of this RI P. Proposals shall be signed by a <br />company olTicial with the power to bind the company- Please be explicit in identi_4ving <br />the appropriate person kith le,;ral enahority to bind the coniputiv. <br />The proposal fee schedule must be submitted as a separate attachment in the <br />PlanetRids system, and not he included as part of the proposal. <br />The Statement of Qualifications shall be limited to a maximum of fifteen (15) double - <br />sided pages (excluding front and back covers, section dividers and attachments such as <br />resumes, forms)- Font size shall be minimum 11-point Arial. Proposal exhibits shall he <br />rnaxirntnn I I" x 17"- <br />Proposal Evaluation and Rating <br />.fhe criteria for evaluating the proposals submitted is shown below. <br />Relevant Project Experience 35°/, <br />Firm/Team Experience 3094 <br />l lndersianding of Need 25"/o <br />References t o% <br />The City has established a proposal review committee to evaluate proposals based on the <br />response to this RFP, which includes adherence to outlined directions and format, and the <br />City evaluation criteria set forth above- A final score will be calculated lot each <br />subinilted proposal and usal to rank the proposers. <br />After ranking, cost negotiations may begin with the most qualified contratctoris) and only <br />their cost proposals will be opened- Should negotiations fail 01- result in a price that the <br />City Council <br />26-10 <br />6/15/2021 <br />City of Santa Ana RFP 21-004 Pagc 4 <br />