My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br />Appendix <br />ATTACHMENT 1 <br />SCOPF OF WORK <br />14r1MI p OMOrILEAâ–º`M <br />REQUEST FOR PROPOSALS <br />FOR <br />TESTING AND SPECIAL INSPECTION SERVICES <br />RFP NO. 20-111 <br />INTRODUCTION/BACKGROUND <br />L,nder the City of Santa's Capital Improvement Program, a number of construction projects will <br />lake place in die next few year. I hese projects include ,,(reel pavemenl, trarlic signals, <br />underground utilities, buildings, bridges and park litcility improvements- The total value of <br />construction is estimated to exceed S100 million. <br />In order to maintain high quality orcons(-uclion, the Cily intends to relain testing and inspection <br />firms to provide quality assurance services for those prqjcets- The scicctcd firms arc expected to <br />provide testing and inspections for construction activities involving grading, soils, base material, <br />concrete, masonry, asphalt concrete, structural steel, reinforcing steel, painting and to provide <br />other quality assurance services when required. <br />The purpose of this RFP is to solicit proposals from quality control consulting linos for the <br />required services. The selected consultant is expected to ester into art at;rectnent with the City to <br />provide services on an as -needed basis. <br />Prime consultant mark -tips for sub -consultant work will nut he allowed - <br />All proposals, plans, drawings, specifications, estimates, grant applications, modeling, studies. <br />presentations, and/or reports will be subject to the final approval and satisfaction of the City- The <br />scicctcd Consultants must have thec expertise, cxperieicc, and demon arated resoutces available to <br />perform the work described in this RFP. <br />The City desires to enter into Agrecancatts with multiple top-ranking firms for an initial three <br />yeat term- with a City option to exercise one ( I ), two (2)-year extension period- The annual amount <br />to be expended under the Agreement will vary at the City'., discretion and will be dependent on <br />available fitnding. <br />City Council Gity of Santa Ana RgR 20-ft21 7/6/2021 <br />Page Al-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.