|
All Y ft IP op, I::nl.'ld,, IM< 1
<br />atEiF��'t�
<br />Sedimil D::: �Ilro�$lesr i;alrurlM.i.mu of1'���tIM.
<br />PI-,( J ve:rf 21naalie a'staanaallae
<br />The project consists of providing quality assurance services for street pavement, in,
<br />signal, underground utility, building, bridges, and park projects in the next few years -
<br />Testing and inspections for coil sn-uctiOil activities will include, but not he limited to, grading,
<br />soils, base material, concrete, tnasumy, asphalt concrete, stnrctural steel, reinforcing steel,
<br />painting and other quality assurance services. inspections and testing will be provided for
<br />the installation of precast and cast in -place concrete, welding high strength bolts, stracturatl
<br />steel, masonry and other types of work in accordance with the California Building Code
<br />(CBC) and the contract documents. Field reports will be submitted daily to the City's Public
<br />Works Agency and the Planning and Building Agency and w other conccrnul parties and a
<br />final report will be provided within five days after work is completed. All deputy inspectors
<br />Will be registered with the City's Planning and Building Agency prior to the Stan of
<br />inspections- Available tests may include the follovwing: mix designs, concrete, concrete
<br />blocks, brick masonry, masonry prisms, moron and grout, fireproofing, soils and ag«rcgatcs,
<br />asphalt concrete, reinforcing steel_ and envirortrnental. llispectors will be certified for
<br />confined space and fat protection. AliSCO will recomntcnd testing methods on defective
<br />work and advise the City of acceptance standards. Source inspection for concrete and asphalt
<br />concrete at mixing plants and other materials at their source will be provided in accordance
<br />with prrijcct specifications. All testing, will comply with the City's QAP and contlucLcd
<br />tinder the supervision of a registered engineer (P.I?.) who will certify all test results. All
<br />personnel and laboratory personnel will possess applicable certifications understanding and
<br />extensive experience with FEMA, AASTTTo, ASTM, Caltrans, and local guidelines;
<br />laboratory and staff shall maintain cun-ent Calu-ans accreditation; and contracted laboratories
<br />will maintain saint licensing as primary consultant. AESCO will comply with all
<br />requirements of Caltrans Construction Manual including certification of persormicl and is a
<br />part of all independent assurance testing and sampling program and correlation testing
<br />program through ARMI,, CCRI,, A.ASH'I0, and C'alu-arts I61', Aggregate samples obtained
<br />at the material source shall be tested lbr sand equivalent cleanness value and sieve analysis
<br />within 24 hours. Test results for soil and aggregate samples obtained at thejob site are to be
<br />reported within 72 hours. Test results for compaction and density tests are to be reported
<br />Within 24 hours. Test results for soils and asphalt obtained at the job site (k-Value, asphalt
<br />extraction, etc.) are to be reported within 96 hours.
<br />ma. h,u(kAo.'v hoar mak1A."Als IIIes¢tng,Iild Ann^specoitann
<br />AFSCO's method of operation is the following:
<br />• Prior to the start of any projcct AFSCO will become familiar with the contract
<br />documenL,, projecL plans, technical specification, existing, site(s) and conditions, anti
<br />other pertinent project doCLn71enl5.
<br />• Prior to thee start of any project AESCO will meet with the CITY to review sLaffimg,
<br />projcct needs, coordinate inspections and testing review budget cunlrok, and will
<br />also attend the pre -construction tnecting(s) if requested.
<br />• AESCO provides a 24-hour live answering service and one of our Project Engineers
<br />Ciorm YHnial Testing/ Inspection
<br />Environmen al an Geotechnical Engineering Services
<br />www.AoscoTech.com
<br />g I t, ;2 1, — 29
<br />'�maan 7�e fRaaed Zip
<br />
|