Laserfiche WebLink
All Y ft IP op, <:an1.'1,1,, IM< 1 <br />atiF��'tl� <br />is always available to answer any technical or scheduling issues. Technicians shad he <br />available upon 24-hour notice and for occasional night work. <br />• AESCO digitally controls all assigned tasks to our technicians and each unit of <br />service is closely watched by our project manager- AESCO does not exceed the <br />assigned budget for its services prior to authorization by the CITY. <br />• The inspector (or inspectors) tltcrr arrives at the site to pertitrm the required tcsting <br />and inspections. The technician will arrive at the site with the correct equiprnent, <br />calibrated to existine standards with documentation. Equipment calibration shall be <br />performed prior to the start of work and costs are included in the total hourly rote for <br />field services- All samples will be transported fi-om the project site to the laboratory <br />for testing as required. <br />• All breaks and laboratory testing is scheduled through our electronic dispatch system <br />,where nolilicaiion is atomically issued to the laboratory manager to perform specific <br />tests, such ac breaks of concrete cylinders at a schedule of 7-day, 14-day and 2k-day <br />breaks; beans breaks; masonry block breaks; prism break~: etc. <br />• Daily field reports and test results are created digitally in a standard report forinat and <br />cinailcd within 24 horns of completion of the test of inspection to the CITY. Field <br />lrsting/compaction results of subgrade or asphalt concrete shall be Communicated to <br />CITY personnel as soon as the tests have been completed, on same day of testing, <br />with hard Copy to follow. <br />• Any lest or inspection deficiencies, such as. failing compaction, concrete not reaching <br />the required st-CnUth, concrete with high slump, cleanness of rcbar, cleanness of <br />footings, eta, will be discussed immediately with the CITY. Our professionals will <br />provide practical solutions to critical issues encountered in the field, considering both <br />cost andtechnical implications. <br />• A final certification report of all inspection service~ perlonned sumniaiizing test <br />results and raw data will be submitted for review following completion of <br />const-uction which will stunmarize all failed and passing tests. The report will <br />include the tests performed, where the test was performed or the sample was takerr, <br />testing dates at time, and test standard used, the approximately quantity of material <br />represented by the test, will clearly identify a puss or fail result, and will sununarize <br />Findings, Conclusions, results and reCOMmendations- The report will be sinned by a <br />California Licensed Professional Engineer/Gcotechnical Engineer. All laboratory <br />reports and inspxtion reports are supervised, reviewed and signed by it Calitornia <br />Licensed Professional Engineer/Geotechnical Fmzineer. <br />• AESCO will comply with OSTTA requirements Safety Standards. <br />• All technicians are adequately insured for liability and property tannage, and a copy <br />of the policy will be forwarded to the CTTY upon request. Vehicles bear the firmt's <br />name- <br />• All inspectors are regtllrcd to con1I hluiCatC on a daily basis with Our QUMity Control <br />Manager who ensures that all work is being performed in accordance with the Quality <br />Control Manual. <br />• AESCO has been successful in consistently completing its projects within the <br />assigned budget and schedule. We thoroughly evaluate our task and scope of wort: <br />and build an efficient budget for our work. Therefore, we seldom exceed the budget <br />Ciorm YHnial Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br />a d r 2? ,- 30 <br />7ia. 7.'e fmaaed 'I2p <br />