My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ll Y'f v ]I, op, <:anl.'ld,, IM< 1 <br />Section I: Riell wauf. Prar».I���:� llf;x�IPelrllenmc,, <br />HDPE Installation, Country Glen Way, City of Anaheim <br />It rl ` 4' , ( /``5. <br />AESCO performed the materials testing and inspections for the installation of an TTDPE <br />watcilinc in the City of Anaheim. AESCO performed the tcstinn and inspcetion, of the <br />trench backfill. Subgrade and asphaltic concrete which was placed to restore the site to the <br />original condition, including replacement of curb and gutter, cross gutter, sidewalk, <br />landscape and irrigation, and paving. AI:SCO performed compaction testing of the trench <br />backfill and stibgrade. Asphalt testing Was perfbnned at the plant and as it was placed on the <br />roadway- Classilication testing was perlirrmed on the subgrztdc material and maximum <br />density compaction testing was performed on the subgrade and asphalt in inv Huntington <br />Beach laboratory. <br />Project Highlights: <br />-Quality Assurance inspection and testing <br />.Testing and inspection of asphaltic concrete <br />a Testing and inspection of subgrade <br />Start Date, 201R <br />Completion Date: 2018 <br />Total Cost: $500,000 <br />Client: City of Anaheim <br />Role: Construction Materials I esting and Inspection <br />Key Personnel Involved: Adam Chamaa, P.F., G.F. and Dave Ryan, P.F. <br />Reference <br />Tim Flint, Construction Managrr, City of Anaheim I City of Anaheim 1 200 South Anaheim Boulevard, Anaheim, <br />CA 9280S I Phone- 714-76S-S271 I E-mail! I:Fl nl;(iri;;In_thr� rn_ ri get <br />Ciorm YH6val Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br />;I r2,l,-32 <br />2at[diEll�O.��x e: ten <br />'�maan 7�e fRaaed ?2p <br />
The URL can be used to link to this page
Your browser does not support the video tag.