Laserfiche WebLink
A ll Y f v lP oll,I<:: ln.'ld,, IM< 1 <br />"4�$AiGHll Iv;IIlh. o (.,rya31Ph arfu t9 <br />405 Freeway Widening T^ <br />AESCO is performing. the Quality Verification <br />inntcri;I N IC>I.ing anti. inspcctioII (luring, widening, of <br />the 405 Freeway between Euclid Succtand the 605 <br />Freeway, it total of 16 miles. The widening project <br />include; the Construction Of nets lanes on the <br />nidhbound and northhnund sides, new rosining <br />walls, bridgcN, olc. 11w, testing and inspection <br />services include(] a review of the concrete mix designs, concrete resting an(t inspection, concrete <br />batch plant inspection, pile inspection and logging, rcbar inspection, aggregate testing, welding <br />inspection, Snbgra& testing and inspection, base irinronal evaluation and testing, compaction testing <br />and inspection, and asphaltic eoneroc teeing. AFSCO also proparert the Quality Manual for the <br />project including all Torus. An Actially Dcpositcd Lcad (ADL) study was also perfolmed. <br />Prgject Highlights: <br />• C:Onsllile6011 Matcrish and Soils Inspection and 'I esting for I Iceway Widening Project <br />• Prepared Quality Control Manual list the project <br />• Cuotdinating and managing construction malctiaL testing and inspection services <br />• L'nvitvnmenlal Sampling of Acrially llcpomicd 1-cad (AL)L) <br />•Asbestos Survey and Abatement 0%crsight <br />• L'nvironmcntal .tsscssrucot ofcican import and hydrocarbon tmpactcdoil <br />• Gculechnical Engincering fur retaining walls and cctnasiv it <br />Prgject Challenges_ <br />• AESCO provided a-esolutions to non-Conlonnance rgiorts (NCR) related to quality issues dm-ing <br />cunsu-uction in a tinkly msnner to keep the project Oil scllcdulc. Provided C0IDCC11Ve adorns to be <br />taken and measures to prevent fimune NCR';_ <br />• AESCO provided complete dnetnnentatiun and research associated with any NCR (specitications, <br />srandaids•, attd list of procedures) that teem affcctcd by [lie issue. ALSC'(-) rec:onnnended mttigalion <br />measures altd action plans to resolve any NCR's. <br />• AESCO worked cluscly with the dcsiprbtuld turn to prevent titttu-c NCR's from occurring_ <br />Start Date: 2018 <br />Completion Dale: 2023 (Piojucted) <br />Total Cost: $ L9 hillion <br />Client: O(' 405 Partners <br />Role: QC lnepcctwtl autd Testing <br />Key Personnel involver]: Adam Chamaa.. P.E.. G.E.. Russ Scharlin, P.E., O.E., Debra Pcrcz, Omar Chamaa, <br />Giovanni MikltaiL Chris Subek, L), vid Rvart, Y.L. <br />Reference <br />Reem Hashem, Principal Contracts Administrator I OCTA 1550 South Main Street, Orange, CA 92868 <br />1 Phone: (714) 560-5446 1 E-mail: Rhashem@octa.net <br />COMVC YH6lial Testing/ Inspection <br />Environmental and Geotechnical Engineering Services <br />www.AoscoTech.com <br />33 <br />2at[diEII�O.Y�x r: ten <br />'�maan 7�e fRaaed ?2p <br />