Laserfiche WebLink
atCiF�♦w'tl� <br />All Y'tv II, op, <:a11,1,, IM< 'iWculcirit or <br />R„.nssa:tAA fscha rlivn <br />Senior Geotechnical EngineerlQuality Control Manager, P,E„ O.E. <br />Russell Scharlin is a senior geotechnical engineer with over 30 years <br />of experience in civil and geotechnical engineering. Primary <br />responsibilities include performing all aspects of construction <br />management, geotechnical engineering and environmental studies. <br />Mr. Scharlin has provided design and construction management <br />services related Lo pavements and roundations for numerous <br />structures, bridges, pump stations, freeways, tanks, communication <br />towers and other structures. <br />SPR Cifit: IPlrrt:ject [.xperie nce <br />Seismic Remediation-Elevated Roadway -John Wayne Airport, Santa Ana <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager <br />for the seismic, retrofit of the bridge structure located at the John Wayne <br />Airport. The project was for the County of Orange and Caltrans. The <br />project consisted of installation of 64 steel column casings at select <br />concrete column locations, enlargement of selected foundation pile caps, <br />installation of new expansion joints at terminal vehicle ramps and <br />walkways, detensioning and retensioning of slab tendons and <br />miscellaneous pavement and sidewalk improvements. Also prepared the <br />Construction Quality Control Plan and the Welding Quality Control Plan. <br />Ai rd Y,lrn<'k"rNan S,° <br />r/aadrvrtar'Slly nM/. <br />i Q dALrdrtna'p1tl24 !Art ll (LIVB'n <br />B.:i:.., 0t if <br />b�. erps4ze�ererely, <br />( afrfiF' Jw) add 9'u q l wC <br />haANtlr ®lt.,rit A U R d <br />,'craft'd I' I AJliAkl�Af1^ <br />A H•i°or","h9 h-al <br />� A�aYlf/,'PAroLCaA <br />Civil l"rrf"ineca, Nfrar al" ' <br />rcr�a'xrrt^a'+ul lnx sev"'Fri <br />'Plnrr nft Ar'a..J <br />Perris Valley Line Commuter Rail Extension Project -Riverside County <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for quality control <br />inspection and materials testing and geotechnical engineering services for the Riverside County <br />Transportation Commission. The project involves a 24-mile extension of the existing 512-mile <br />Metrolink commuter rail system from Riverside to Perris. <br />Sand Canyon Grade Separation -Irvine <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for the materials testing <br />and inspections for the Sand Canyon Grade Separation project at the 5 Freeway in Irvine. The <br />project includes Lhe construction of a rail underpass, retdinine, walls, rdilrodd relocation, slorrn <br />drains, utility relocations, Sand Canyon Avenue relocation, and a new pump station. Third parties <br />involved in the project include the City of Irvine, the Southern California Regional Rail Authority, <br />Caltrans, and the Irvine Ranch Water District. <br />Puente Hills Intermodal Facility and Railroad Improvements -Industry <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for construction of the <br />Intermodal Facility where waste will change from transportation by trucks to trains to the Mesquite <br />Landfill in Brawley, California. The project included the construction of a new roadway corridor <br />constructed in a trench, a new pump station placed 40 feet below finished grade, a new <br />administration building, a new maintenance building with a below grade basement, and a 144 foot <br />long storm drain. <br />Ciorm YHnial Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br />nI r2 ,-44 <br />'�maan 7�e fRaaed Zip <br />