My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A ll Y f v ]I, op, <:anl.'ld,, IM< 1 <br />atiF��'tl� <br />Auto Center Drive/BNSF Railroad Grade Separation -Corona <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for the geotechnical and <br />materials testing and inspection services for the project which was for Riverside County <br />I ransportation Commission and the City of Corona. I he project consists of constructing a four -lane <br />overcrossing at Auto Center/BNSF railroad tracks. Construction required a bypass roadway, <br />associated roadway improvements, retaining walls, storm drain, sewer line, utilities, and CIDH piling <br />foundations. <br />Olinda Landfill -Gas to Energy Facilities — City of Yorba Linda, County of Orange <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for construction materials <br />testing and inspection services during construction of the gas to energy facilities at the Brea-Olinda <br />landfill for the City of Yorba Linda and the County of Orange. I he facilities included the installation <br />of gas turbines mounted on concrete slabs, a combustion turbine generator, chilled water systems, <br />polishing systems, compressed air systems, a step-up transformer, switch gears, axillary <br />transformers, a main building and control room, trenching and piping, and miscellaneous structures. <br />New access roads were also constructed_ <br />Warner Avenue Gravity Sewer Lift Station C — City of Huntington Beach <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for the construction <br />materials testing and inspection and for the geotechnical and environmental Phase 11 investigations <br />for a new lift station facility. The project consisted of the replacement of the existing Lift Stations B <br />and C and the Sunset Beach Sanitary Lift Station with a new Lift Station C. The submersible lift <br />station incorporated a 14 foot by 26 foot by 22 foot deep wet well. The bottom of the well <br />foundation was approximately 26 to 27 feet below existing grade. The new lift station also included <br />an 8-foot deep valve vault which was 1S feet by 10 feet in plan dimension, a 60 kW outdoor <br />generator, and electrical panels. <br />Ranger Sewer Lift Station No. 16 — City of Huntington Beach <br />Geotechnical Engineer_ Mr. Scharlin was the Geotechnical Engineer for the geotechnical <br />investigation and the materials testing and inspection for construction of Ranger Sewer Lift Station <br />No. 16 in the City of Huntington Beach. The new lift station was 21 feet by 2� feet in plan dimension <br />and was placed at a depth of 18 feet below the existing ground surface. <br />State College Boulevard Grade Separation -Fullerton <br />Quality Control Manager: Mr. Scharlin was the Quality Control Manager for the replacement of the <br />at -grade railroad crossing by construction an underpass for State College Boulevard beneath the <br />existing BNSF railroad. The City of Fullerton and the Orange County Transportation Authority <br />(OCTA) constructed a vehicle undercrossing at the intersection of State College Boulevard and the <br />Burlington Northern Santa Fe Railway. The roadway was lowered between Santa Fe Avenue to the <br />north to approximately 500 feet south of Valencia Drive to the south. Construction consisted of a <br />temporary railroad shoo -fly, a railroad bridge, retaining walls, a purnp station, pavement and <br />utilities reconstruction. AESCO performed QA inspection and testing for earthwork, foundation <br />installation, concrete, reinforcing steel and pavement reconstruction. <br />CmcYHnial Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br />„➢I r2 ,-45 <br />2at[diEll�O.��x e: ten <br />'�maan 7�e fRaaed Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.