My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
A II Y'f v P op, <:anl.'ld,, IM< 1 <br />atCiF��'tl� <br />f);.i d8d .l... f'f8dpark <br />Senior Engineer, P.E. <br />Registered civil engineer with over 40 years of experience as materials ' ra"di <br />testing, special inspection services manager. Responsible for laboratory <br />and field testing services on materials such as concrete, soils, a t,fddq pme" d V, beer <br />aggregates, reinforcing steel, structural steel, high strength bolting and <br />welded structures. <br />W nn 5ya;6arulFen ear <br />C'afilnveaier hero, d'19661 <br />bu:9edfic Piroj'ct, Fxv.,)eir RE';Irice. PC.Ovel:) <br />Beach Boulevard water Main Extension Project -City of Huntington Beach <br />and Caltrans <br />Senior Engineer: Mr. Ryan was the Senior Engineer for a 1500 foot extension <br />of a water main on Eastbound Beach Boulevard between South Warner Avenue and Robidoux Drive <br />and West Beach Boulevard to East Beach Boulevard at Holt in the Caltrans right-of-way. The entire <br />project was constructed at night to accommodate traffic on Beach Boulevard. The testing and <br />inspections included the placement of all structural fill and backfill, concrete testing and inspection, <br />subgrade and aggregate base placement and compaction, asphalt paving construction (base and <br />surface layers), rubber asphaltic concrete, slurry backfill, and inspection of three kinds of pipe-pvc, <br />ductile iron, concrete mortar steel lined pipe, and pvc water lines, valves, fittings and the existing <br />lines connections. Mr. Ryan attended the preconstruction meeting, worked closely with AESCO and <br />the Clty's engineers to provide approval of material submittals, response to RFI's, assisted In the <br />resolution of construction matters, change orders, maintained the daily diary and the QA/QC logs. <br />Mr. Ryan also coordinated street closure and traffic control to verify that it was in accordance with <br />Caltrans requirements, encroachment permits, noise control, vibration monitoring, and SWPP. Dave <br />reviewed daily work tasks with the Contractor and verified that work was proceeding in accordance <br />with plans and specifications, alerted contractor to project requirements, verified depth of asphalt <br />and aggregate base and measured that the roadway met the required depth of asphalt and <br />aggregate base nightly. Also verified the trench backfill, pipe bedding and rolling and compaction of <br />the asphaltic concrete. Tracked construction schedule and quantities of materials. Reviewed <br />contractor payment schedule. Worked closely with the City of Huntington Beach Senior <br />Cunslruclion Project Mdnager. <br />Long Beach Main Pumping Plant, Los Angeles County Sanitation District -Long Beach <br />Senior Engineer: Mr. Ryan was the Senior Engineer for the quality control inspection and materials <br />testing and geolechnical engineering services for the conudclor for the Los Angeles County <br />Sanitation District for the New Main Pumping Plant. The project involved a 50-foot wet well next to <br />the existing plant along the 710 Freeway, adjacent to the Port of Long Beach. Forty separate <br />structural concrete pours were performed below grade which required mass concrete -thermal <br />control. <br />Gerald Desmond Bridge Replacement -Port of Long Beach <br />Laboratory Quality Control Manager: Mr. Ryan was the Laboratory Quality Control Manager for <br />production testing of all reinforcing steel splices in accordance with Caltrans procedures for the <br />replacement of the existing bridge. Sampling and testing were performed for rebar welded hoops, <br />couplers, and reinforcing bars during construction of the foundations for the new bridge. <br />C d�x��crm YHnial Testing/ Inspection <br />Environmen al an Geotechnical Engineering Services <br />www.AoscoTech.com <br />r, I r 2? ,- 46 <br />2at[diEll�O.��x e: ten <br />'�maan 7lee fRaaed Zip <br />
The URL can be used to link to this page
Your browser does not support the video tag.