Kleinfelder Statement of QualificationS for Qn-Call Material Testing and Special lnSpeCtlon ServiceS
<br />for City of Santa Ana, RFH No. 20-111
<br />Laboratory test reports will be forwarded electronically to the City's representative and designated
<br />team members. Our laboratory test results will be submitted in accordance with the time frarnes listed
<br />in the City's RFQ Section titled Reporting Test Results. A final report will be prepared for materials
<br />testing and inspection services, summarizing the observations and testing made in the field and
<br />laboratory, and providing conclusions for suitability and recommendations. T r, o w,. a on war
<br />rvU-r. , L r w n t I I'I,w) re nrr rr:re,ar .. r.r, t, n m 7 �4 n' r I ",.a ' r 0„,'..k,
<br />Commitment to Safety
<br />Kleinfelder employs the LPSt (Loss Prevention System) program in all of our work practices. The
<br />basis of LPS is reducing losses (both safety and financial) by identifying unsafe conditions or
<br />behaviors and providing the means to mitigate them. Kleinfelder's adoption of the LPS® system has
<br />resulted in a total recordable incident rate (TRIR) of 0.40, the lowest in Kleinfelder's history.
<br />Kleinfelder is proud to have integrated the LPStat system into our culture, and we believe it sets our
<br />firm apart from our competitors by taking a more focused and proactive approach to safe work
<br />practices and empowering each employee to identify potential hazards and make safer choices.
<br />e. Relevant Project Experience
<br />Client: OCPW
<br />Fee' $1.5M
<br />Duration: 2015 - ongoing
<br />Reference:
<br />Vinh Tran, PF, Senior Fngineer
<br />714.955.0210
<br />vinh.tran cr ocpw.ocyov.corn
<br />Relevance to this Contract:
<br />• Materials testing and
<br />inspections
<br />• I aboratory testing
<br />• Public structure improvements
<br />• Geotechnical engineering
<br />review of contractor submittals
<br />Key Staff
<br />• Dany Hanna, PE, MS, MBA
<br />• Mike Dorsch
<br />• James Stiady, PhD, PE, GE
<br />• Rick Bell
<br />• Bryan Reese, ASP
<br />• Eddie Jabbour
<br />- Juan Le Roy
<br />• Jeffrey Diaz
<br />• Cameron Massa
<br />Ali Rehman
<br />• Toni Rebosky
<br />• Shawn McLaren
<br />- Sage Dempsey
<br />• Michael Magana
<br />• Dominic Montemayor
<br />• Christian Castanar
<br />• Edmond Jabbour
<br />Kleinfelder is currently providing construction inspection,
<br />geotechnical engineering, and materials testing and inspection
<br />services for OCPW under the a ir mr,r_ r .rmt 0, M Yr r1 r N.
<br />Under on -call contract, Kleinfelder is providing materials testing and
<br />inspection services in support of the OCPW QA program for
<br />construction of new or rehabilitation of existing roadways, flood
<br />control channels, parks, or other infrastructure projects. All testing is
<br />performed in accordance with OCPW Standards and Procedures
<br />using CTM, ASTM, and/or AASHTO-AMRL testing. Kleinfelder
<br />complies with the County of Orange Standard Plans, Greenback
<br />Specifications, Caltrans, ASTM, AASHTO-AMRL, and APWA
<br />Standards. In addition, Kleinfelder's material testers, inspectors, and
<br />laboratories are certified with Caltrans, CCRL, AASHTO-AMRL
<br />resource accreditation, and ASTM D3666. Kleinfelder also complies
<br />with all applicable requirements of the California Construction and
<br />General Industry Safety Orders, the California Occupational Safety
<br />and Health Act (Cal -OSHA), County of Orange's Safety and Loss
<br />Prevention Program and all applicable laws and regulations.
<br />Oso Parkway Bridge Replacement, Aliso Viejo. This project
<br />consists of the removal, relocation and adjustment of existing
<br />improvements, excavation and grading, removal and relocation of
<br />existing utilities, construction of new storm drainage and storm water
<br />pre-treatment and storage system, construction of curb, gutter and
<br />pedestrian walkways and ramps, bridge construction, roadway paving
<br />and new overhead signage and traffic control devices. r i r r^ i . rw
<br />Kleinfelder has
<br />performed concrete batch plant inspections, PCC aggregate sampling
<br />and testing, and onsite flexural beam fabrication and laboratory testing
<br />per Caltrans test methods. Additionally, HMA batch plant inspections
<br />occurred and Kleinfelder materials testers sampled the HMA, binder,
<br />and aggregates for testing in our Caltrans accredited laboratories.
<br />City Council
<br />21 — 101
<br />04 0 , 10
<br />7/6/2021
<br />
|