Laserfiche WebLink
RFP #21-017: On -Call Environmental Review Services for the <br />Housing Division <br />City of Santa Ana Community Development Agency <br />Corinne Lytle Bonine, PMP <br />Director of Environmental Planning <br />D„ .4V Pn I r,,l n.,,,,'r, 1, 1 ( I4, , r,...p r <br />hA �r rn u�I,, I'dI, ,I ^z. <br />Unrvu situ �I o_aldu lo, .,nnta Corinne Lytle Bonine is the Director of Environmental Planning at Chambers Group, as <br />vl 0r ,,,,,,,; well as a Senior Project Manager with over 15 years of experience. She has managed an <br />array of NEPA and CEQA docurnents (including CEQA-equivalency and adjudicated CEQA <br />processes): Environmental Impact Statcrients, Environmental Impact Reports, <br />Ir >I,•a nn rn q i nn,"t Applications for Certification to the California Energy Commission, Environmental <br />I'r >Iv r,icnd it �rNp>756 <br />A-sesslrients, and IS/IVIIVDs, exemptions/exclusions. <br />r .. D.;.;.. L'' Both an accorrlpllshed Learn leader and field agent, Corinne has served as the visual <br />resources and land use Specialist on more than 75 projects. Her perrnitting projects <br />.��� rn„gc ,un1y r omprho nsi„s include Endangered Species Act Sections 7 arid 10 consultations, USACE Individual <br />pr-sent Peri'mrs, and Section 106 consultations. She has rrlanaged environmental constraints <br />analyses, fatal flaw analyses and technical report,. Her experience Includes supervisory <br />I'r>Iv nrn, l A &i]liar �i <br />f rnnr,�npn� r.il l'I,I sirruals IOCS in geflCl al environmental projects, large-scale crivironmental QrrripldnCC'plojCCtS, <br />,I,ur „�ncie n+„ u�g rn r;tr r,IrR ;an as well as in visual resources and land use impact analysis_ <br />fNa lrt>�hdr larfhrt rrpr ,q ,f ,'. <br />r-sir, lA li yrpr tt ef01 <br />r pJrrlp or ,, rtrr 'a 22_1_Init r;lndorninuirn Pr.ojrr,r, Lnvir,(;nr rr)rnl IrTYpw—r VlCprwt, 13 I1L1en{o, <br />r o,rr pr aht n,ivr Q4,•tiPur dil@ CA <br />Lne+rrw N Project Manager. Managed preparation of CEQA documentation for the 22-unit <br />c1 Iig condominium project that would include the demolition of a historic theater. The <br />raI„ d,k. r [IC rbv Project included technical analysis for air quality, GHG emissions, and a historical <br />assessment. <br />FIA6 North I la. rm.,rcaty ii+hoal ISP IN11b, 11-0 D, Itvina, CA <br />Project Manager. Irvine Unified School District proposed to build a new elementary <br />school, PAIS North Elementary School in order to accommodate the increasing <br />enrollment demands for the District within the Orange County. PA 6 North Elementary <br />accommodates a maximum of 1,000 students with 75 staff members and will provide I<- <br />6th grade educational services. Chambers Group prepared an IS/MND, including <br />technical studies for air quality, noise, cultural resources, and hazardous materials. <br />ivic G :c_n(r•r BUil in?, 16 I[ DCri),Aa:Icm, KAil... Archiv.-.cu fear the t::::czu.rrttiy 0 <br />'Drange, (.:.iry of Santa Ana, C.)raurg'e C ounry, K:A <br />Senior Project Manager. Corinne developed and delivered the Initial Study/Mitigated <br />Negative Declaration for the Civic Center Building 16 Demolition in Orange County. <br />Located at 601 North Ross St in Santa Ana, the aging building presented additional <br />rhallenges in the form of historic resourres assessments in addition to ha7mat <br />reporting. Additionally, due to project schedule concerns, the administrative draft of <br />the IS/MND was prepared in only 1.S weeks from receipt of notice to proceed. <br />I r ledynr., lfyan Burlrlln,gs GDr.,mo itiean LIH- San Diego K:::ounty Regu.m.all <br />Airp+:rrt Paa.rthcarrty enra San Lgref;ra l..Jnrft+ r.:B Port District, 'a-tn DiKf;ca, CA <br />Senior Technical Reviewer. Corinne conducted an independent review of multiple <br />resource arms during the preparation of the EIR for the proposed demolition of existing <br />aviation manufacturing facilities. The specific issues of concern were the removal of <br />asphalt and other paving materials, the removal and disposal of all hazardous and <br />contaminated construction materials, the removal and disposal of chlorofluorocarbons, <br />the cutting, capping and removal of all underground piping and utility systerns, and the <br />capping of storm drain and sanitary sewer laterals Corinne's work included coordination <br />City Council 15 — 122 7/6/2021 <br />Est A-17 <br />-W' 7979 r' vvwwr <br />