RFP #21-017: On -Call Environmental Review Services for the
<br />Housing Division
<br />City of Santa Ana Community Development Agency
<br />wiLh several agencies, Lhe rdmifica Liuns of his Loric building dernolilion, IeasL Lern nes Ling rniLigd Lion, supervising Lhe
<br />transport and disposal of hazardous material, and coastal zone permitting.
<br />"..rtY of l:,mrrrutoni, frx- 4:onlutnrc railI Q c.nucr, Bc,trrmr<snt, C.A.
<br />Project Manager. The team evaluated the permit application for compliance with the City's General and Specific Plan
<br />and conducting peer review of the applicant prepared IS/MND to evaluate impacts associated with the project and
<br />ensure compliance with CEQA. The proposed commercial shopping center consisting of approximately 37,200 square
<br />feet of shopping center, a 4,300-square foot bread/donut/bagel shop, a 4,370-square foot car wash, and an 8-service
<br />hay tire. store. The proposed project site covers a total of 7.07 acres. The remaining area of the project site would consist
<br />of 56,991 square feet of landscaping and 188,947 square feet of roads and walkways.
<br />n rporior Ava_nuc I'r rir srriau ,uzd 11k yr 6_ Brif lg(" Nu-wporr. Rum h, Ornrig, < low it:y, (A,
<br />Principal in Charge. Chambers Group is working with the City of Newport Beach in the construction of a pedestrian and
<br />bicycle bridge overerossing Superior Avenue, a new larger parking lot with a range of 100 to 123 parking spaces and a
<br />fenced dog park on an approximately 3.4-acre site. I he proposed bridge will connect Sunset Ridge Park to the new
<br />asphalt parking lot located at the northeast corner of West Coast Highway and Superior Avenue. Due to the location of
<br />the project and being partially funded by federal funding, Chambers Group Is responslble for preparing CEQA
<br />documentation, NEPA documentation and California Coastal Development Permits. Technical Studies (air quality, GHG
<br />emissions, energy and noise analyses, initial site assessments, hazardous materials analysis, Coastal California
<br />Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared as an appropriate CEQA
<br />documentation to provide the public and responsible agencies with information about the potential environmental
<br />impacts associated with Project implementation. I his IS/NIND includes a project -level analysis of the potential effects.
<br />As a part of the NEPA documentation, Chambers Group was responsible for coordination with the Caltrans Local District
<br />and the resulting preparation of a Categorical Exclusion as the appropriate form of NEPA documentation.
<br />900[ E. VVIiitier BoijkUvarrj DcYr oprnera I�S/F11,J D, Pico 1Uvr,ra. Lr , Angr.lr , r"�suury, ti..:A,
<br />Project Manager. The proposed project is located at 9001 Whittier Boulevard. The parcel contains a 12,126-square-
<br />foot drive-thru building, currently occupied by Bank of the West. Dynamic Development intends to purchase the
<br />property and demolish the existing building and construct a new drive-thru for Chick-fil-A and a new retail building,
<br />which will house Bank of the West and one other retail tenant, yet to be determined. The proposed project is located
<br />within the City of Pico Rivera, California and represents infill development. Chambers Group managed the preparation
<br />of an IS/MND and associated technical studies including parking analysis and a traffic impact study. In order to meet
<br />purchase requirements, Chambers Group delivered on a project schedule that necessitated certification at a Planning
<br />Commission meeting on November 21, 2016, after receiving notice to proceed on September 12, 2016.
<br />(gild cre Ivl ruc, hititil Study Add(Ildi,lln (.]iry Of Pflkn:➢a , (_A
<br />Managing Environmental Planner. The proposed project is located in a vacant lot in the City of Palmdale with a land
<br />use designation of Industrial. A previous MND and Conditional Use Permit were prepared for the project site to be
<br />developed as a bagging facility in 2002 and 2009, respectively. Due to project use changes, the Client prepared an
<br />updated entitlement application for the use of 14 of the 20-acres of the project site and construct a paver plant facility
<br />instead of the previously proposed bagging facility. Chambers Group completed the requested entitlement application
<br />for the proposed project, conducted a site visit with the Client, prepared an addendum summary to the previous MIND,
<br />and reviewed and incorporated the results from the following technical studies into the addendum: Air Quality, Cultural
<br />Resources Study, Biological Resources Report, Phase I Environmental Assessment, Acoustical Report, and Geotechnical
<br />Lngineering Report. I he proposed project and entitlement application were approved by the City of Palmdale Planning
<br />Commission Staff.
<br />City Council
<br />Est
<br />-rW' 7979
<br />15— 123
<br />A-12
<br />vvww L iL n� , ,,u ), ) i.;.t;orn
<br />7/6/2021