Laserfiche WebLink
RFP #21-017: On -Call Environmental Review Services for the <br />Housing Division <br />City of Santa Ana Community Development Agency <br />wiLh several agencies, Lhe rdmifica Liuns of his Loric building dernolilion, IeasL Lern nes Ling rniLigd Lion, supervising Lhe <br />transport and disposal of hazardous material, and coastal zone permitting. <br />"..rtY of l:,mrrrutoni, frx- 4:onlutnrc railI Q c.nucr, Bc,trrmr<snt, C.A. <br />Project Manager. The team evaluated the permit application for compliance with the City's General and Specific Plan <br />and conducting peer review of the applicant prepared IS/MND to evaluate impacts associated with the project and <br />ensure compliance with CEQA. The proposed commercial shopping center consisting of approximately 37,200 square <br />feet of shopping center, a 4,300-square foot bread/donut/bagel shop, a 4,370-square foot car wash, and an 8-service <br />hay tire. store. The proposed project site covers a total of 7.07 acres. The remaining area of the project site would consist <br />of 56,991 square feet of landscaping and 188,947 square feet of roads and walkways. <br />n rporior Ava_nuc I'r rir srriau ,uzd 11k yr 6_ Brif lg(" Nu-wporr. Rum h, Ornrig, < low it:y, (A, <br />Principal in Charge. Chambers Group is working with the City of Newport Beach in the construction of a pedestrian and <br />bicycle bridge overerossing Superior Avenue, a new larger parking lot with a range of 100 to 123 parking spaces and a <br />fenced dog park on an approximately 3.4-acre site. I he proposed bridge will connect Sunset Ridge Park to the new <br />asphalt parking lot located at the northeast corner of West Coast Highway and Superior Avenue. Due to the location of <br />the project and being partially funded by federal funding, Chambers Group Is responslble for preparing CEQA <br />documentation, NEPA documentation and California Coastal Development Permits. Technical Studies (air quality, GHG <br />emissions, energy and noise analyses, initial site assessments, hazardous materials analysis, Coastal California <br />Gnatcatcher focused surveys, visual assessment) and a subsequent IS/MND were prepared as an appropriate CEQA <br />documentation to provide the public and responsible agencies with information about the potential environmental <br />impacts associated with Project implementation. I his IS/NIND includes a project -level analysis of the potential effects. <br />As a part of the NEPA documentation, Chambers Group was responsible for coordination with the Caltrans Local District <br />and the resulting preparation of a Categorical Exclusion as the appropriate form of NEPA documentation. <br />900[ E. VVIiitier BoijkUvarrj DcYr oprnera I�S/F11,J D, Pico 1Uvr,ra. Lr , Angr.lr , r"�suury, ti..:A, <br />Project Manager. The proposed project is located at 9001 Whittier Boulevard. The parcel contains a 12,126-square- <br />foot drive-thru building, currently occupied by Bank of the West. Dynamic Development intends to purchase the <br />property and demolish the existing building and construct a new drive-thru for Chick-fil-A and a new retail building, <br />which will house Bank of the West and one other retail tenant, yet to be determined. The proposed project is located <br />within the City of Pico Rivera, California and represents infill development. Chambers Group managed the preparation <br />of an IS/MND and associated technical studies including parking analysis and a traffic impact study. In order to meet <br />purchase requirements, Chambers Group delivered on a project schedule that necessitated certification at a Planning <br />Commission meeting on November 21, 2016, after receiving notice to proceed on September 12, 2016. <br />(gild cre Ivl ruc, hititil Study Add(Ildi,lln (.]iry Of Pflkn:➢a , (_A <br />Managing Environmental Planner. The proposed project is located in a vacant lot in the City of Palmdale with a land <br />use designation of Industrial. A previous MND and Conditional Use Permit were prepared for the project site to be <br />developed as a bagging facility in 2002 and 2009, respectively. Due to project use changes, the Client prepared an <br />updated entitlement application for the use of 14 of the 20-acres of the project site and construct a paver plant facility <br />instead of the previously proposed bagging facility. Chambers Group completed the requested entitlement application <br />for the proposed project, conducted a site visit with the Client, prepared an addendum summary to the previous MIND, <br />and reviewed and incorporated the results from the following technical studies into the addendum: Air Quality, Cultural <br />Resources Study, Biological Resources Report, Phase I Environmental Assessment, Acoustical Report, and Geotechnical <br />Lngineering Report. I he proposed project and entitlement application were approved by the City of Palmdale Planning <br />Commission Staff. <br />City Council <br />Est <br />-rW' 7979 <br />15— 123 <br />A-12 <br />vvww L iL n� , ,,u ), ) i.;.t;orn <br />7/6/2021 <br />