My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FULL AGENDA PACKET 2021-07-06
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
07/06/2021 Regular
>
FULL AGENDA PACKET 2021-07-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/12/2021 12:33:17 PM
Creation date
7/12/2021 9:06:53 AM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Agency
Clerk of the Council
Date
7/6/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1482
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 3 <br />TECFINICALTASK LEADS RESUMES <br />As Michael Baker's Technical Task Managers, the following specialists will manage technical analysis requests, verifying the necessary <br />scope of work with both City staff and ensuring consistency with project description assumptions, adequacy under CEQA and NEPA, <br />and methodology assumptions. <br />Biological Resources Analysis <br />Sensitive Species Surveys <br />FESA/CESA Permittino <br />• TTM No. 36605 and 36608 (Corona, CA) <br />• Arroyo Village Condominium (San Gabriel, CA) <br />• Laguna Beach Village Entrance (Laguna Beach, CA) <br />23 VMT Analysis • City of Bradbury, Chadwick Estates VMT Analysis, <br />Queuing Analysis Bradbury, CA, Traffic Engineer. <br />Level of Service Analysis • Desert Housing Ventures, LLC. Cathedral City Residential <br />Development, Cathedral City, CA, Traffic Enqineer. <br />• City of Malibu, Pacific Coast Highway Median <br />Channelization, Malibu, CA, Traffic Engineer. <br />25 Hydrology Assessment <br />• City of Santa Ana, Santa Ana Storm Drain Master Plan, <br />Water Quality Management <br />Santa Ana, CA, Project Manager. <br />Plans <br />• OC Flood Control Master Plan, Orange County, CA, <br />Project Manager. <br />16 Cultural Resources Assessment <br />• Skyridge Residential Development Phase III Date <br />Native ArnerrcartConsultation <br />Recovery, Mission Viejo, CA, Principal Investigator <br />Section 106 Assistance <br />a City of Anaheim HP$RIASR, Anaheim, CA, Principal <br />Investigator <br />11 1 listorical Resources <br />• University of California Irvine, UCI — North Campus <br />Assessment <br />Project, Irvine, CA, Cultural Resources Specialist. <br />Cultural Resources Assessment <br />• 13861 Brookhurst Street Shopping Center Expansion <br />Native American Consultation <br />Project ISMND. Garden Grove, CA. Cultural Resources <br />Assistance <br />Specialist. <br />
The URL can be used to link to this page
Your browser does not support the video tag.