Laserfiche WebLink
FIRM AND TEAM EXPERIENCE <br />ASSIGNMENT OF KEY STAFF <br />The strength of our team lies in our people. Our <br />proposed team for this contract consists of our most <br />experienced and capable staff. The key individuals <br />proposed for this project have worked for a decade or <br />more on various municipal capital improvement projects <br />and bring a combination of skills and knowledge that <br />will be an asset to this project. Materials testing and <br />special inspection for the City of Santa Ana will require <br />a team that can consistently provide accurate, reliable, <br />and timely services. This will require a consultant who <br />thoroughly understands the project and their role in <br />the overall construction management team. <br />Through our past work with on -call projects of a variety <br />of sizes, magnitudes, and scopes/work orders as <br />with the City's proposed contract, we recognize that <br />your Construction Management team and staff have <br />carefully planned budgets in order to maximize your <br />construction dollars. Each of our proposed inspectors <br />are capable of exercising considerable independent <br />judgment, evaluating a wide range of engineering data, <br />and supervising all work activities involved in field and <br />laboratory testing in order to provide a complete and <br />thorough project close-out for the City. <br />MR. SLAWEK DYMERSKI, PE, GE provides <br />corporate leadership as the Principal -in -Charge <br />to ensure that RMA Group's pledge to service, <br />professionalism, and technical expertise is delivered <br />consistently throughout a project. Slawek is available <br />to your staff to help identify project needs, allocate <br />additional resources, and provide any assistance <br />necessary to ensure successful completion of the City <br />of Santa Ana's projects. <br />MR. RAY ROBLERO will be your dedicated Project <br />ManagerforRMAGroup'sservices and you rsinglepoint <br />of contact for the City's team. Ray will be responsible <br />for coordinating all required manpower, laboratory <br />tests and analyses, and project documentation. As <br />Project Manager, he will be responsible for budgets, <br />schedules, and deliverables and will track the project <br />deliverables and ensure schedule adherence as well <br />as quality in all aspects of RMA Group's work on these <br />projects. <br />MR. KEN DOWELL, PG, CEG will support the team <br />for any geologic or seismic issues that arise during the <br />term of the contract and will execute the field sampling <br />and logging of borings during geotechnical explorations <br />for the project. He will collect site -specific subsurface <br />soil and groundwater information. He will provide field <br />consultation during construction on an as needed basis <br />to address soil conditions that may impact construction. <br />MR. CARL BACHLER, PE, will serve as Laboratory <br />Manager for the project and will oversee all laboratory <br />testing activities. Carl has priorand ongoing experience <br />working with materials testing for geotechnical as well <br />as other municipal and transportation projects. His <br />familiarity with related code requirements for testing <br />of construction materials allows him to know exactly <br />what to look out for during materials testing in the <br />laboratory. Carl will communicate directly with other <br />team members on the contract's projects, promptly <br />informing them of test results or any potential problems <br />encountered with the construction materials. <br />SPECIAL INSPECTORS 8, FIELD TECHNICIANS <br />Our field staff have been with RMA Group for <br />varying years ranging from two years to more than a <br />decade. They will provide field observation, sampling, <br />documentation, and testing of all soil, concrete, sphalt, <br />and other tests requested by the City, as needed, per <br />each task order. <br />Our staff will also include geotechnical technicians for <br />all soil applications and geotechnical investigations. <br />Our lead inspectors are handpicked for specific <br />projects based on their experience and certifications <br />and how well those match up to the requirements and <br />construction elements on each project. <br />RMA Group <br />Every Project Matters www.rmccompanies.com <br />RFP NO: 20-111 1 MATERIALS TESTING & SPECIAL INSPECTION SERVICES <br />CITY OF SANTA ANA 20-1600-P SEPTEMBER 30, 2020 Page 4 <br />