Laserfiche WebLink
COMMUNICATIONS PACKAGE: - TSE Wireless Communication Panel - Included <br />TSE Wireless Communication Panel: A TruStar Energy engineered wireless full-time equipment monitoring <br />system which includes: email and text messaging for system faults, continuous time-based logging of <br />system operating parameters, continuous event-based logging of system events. The system provides <br />local web server for real-time and logged data display. Provides for remote access for TruStar Energy <br />data collection and support via secure VPN connection. Also provides Network Address Translation \[NAT\] <br />for secure interface to the customer's network. <br /> <br />INLET GAS DRYER: GD-024-S-M-460-150-3 - Included ANGI single tower manual regen dryer, 24" vessel, 150 <br />psi design pressure, 3" class 150 flanges. Includes digital dew point monitor, isolation and bypass valves, <br />blower, heater, cooler, water separator and collection tank to regenerate the desiccant. Requires <br />460/3/60 power. <br />MOTOR STARTER PROVISION: Motor Starter - Dual 100 hp - Qty 1 - Included <br />The motor starter panel is designed to perform several different custom functions within the compressor <br />design - as well as a soft start for your electric motor. The other functions include, but are not limited to: <br />dryer power, enclosure power, gas detection power, time-fill panel power, cooling fan power, ESD for <br />time-fill line power, and spares for future options. <br /> <br />DIRECT FILL POST WITH STORAGE PROVISIONS – 4-Bottle TF Buffer Storage: - 6,840 cubic ft with Direct Fill <br />Post and Hose - Included <br />This option serves two purposes: as buffer storage, it functions to protect the pressure relief valves on the <br />compressors from back pressure on the time-fill line in the event time-fill lines are disconnected while the <br />compressor is operating. The second purpose provides a means to direct-fill vehicles (similar to fast fill) <br />and dedicates all storage and compressor production to one single vehicle without having to disconnect <br />time-fill lines currently connected to vehicles. This direct fill includes one skid of 4 DOT bottles with bottom- <br />mounted drains - capable of storing 6,840 scf of CNG. Approximately 54 GGE is available from this <br />storage depending on pressure in the receiving vehicle. <br />EMERGENCY SHUTDOWN AND FIRE EXTINGUISHERS TO MEET BUILDING CODE–Included <br />Shutdowns are located at compressor area and dispenser area. <br /> Includes Emergency Shutdown Switch at dispenser area <br /> Fire Extinguisher - 5 lb./ 20 BC/model B402/B402T, 3A:40B:C/ 25-gallon water equivalent <br /> Safety Signs at dispenser area <br /> Safety Signs at dispenser area and time fill areas <br /> <br />TIME-FILL AREA AND EQUIPMENT <br /> <br />Protection for Vehicle Parking and Time-Fill Posts – Included <br /> <br />Wall Mounted: Qty 20 parking locations - Included <br />The time-fill post will be mounted to the wall in a similar fashion as existing time-fil posts. High-pressure <br />piping and electrical conduit will be run above ground mounted on the existing wall on a separate <br />galvanized-steel mounting structure. <br /> <br />Caisson Protection:Qty 20 parking locations -Included <br />When choosing caisson protection, the area will include 3' tall -4" concrete-filled steel protective <br />bollards anchored in an 18" dia. base, 3' in depth spaced 4' on center. Each caisson will contain <br />separate conduit for the high-pressure gas and electrical service. When choosing this option, all high- <br />pressure piping and electrical conduit is run underground between the time-fill posts/caissons. <br />TruStarEnergy-10225 PhiladelphiaCourt,RanchoCucamonga,91730•909-793-3700•(fax)909-793.jj()56•www.trusatrenergy.com <br /> <br />