Laserfiche WebLink
DocuSign Envelope ID: 7DOD574C-B1 E5-4A94-98CC-C2B16DDD7DC6 <br />EXHIBIT 5 <br />Page 18 of 71 <br />PROJECT 3: Groundwater Replenishment System Final Expansion <br />IMPLEMENTING AGENCY: Orange County Water District (OCWD) <br />PROJECT DESCRIPTION: The project is the final expansion of the Groundwater Replenishment System <br />(GWRS). This project will fund a component of the GWRS Final Expansion collectively known as the <br />Advanced Water Purification Facility located in Fountain Valley which consists of additional microfiltration <br />treatment, reverse osmosis membrane treatment, ultraviolet light disinfection, decarbonation tower, pumps <br />and chemical tank. <br />The project provides capacity to treat contaminated groundwater pumped from two plumes, recycles <br />approximately 30 million gallons per day (mgd) of secondary -treated wastewater currently discharged to the <br />ocean, and reduces salt load to the groundwater basin by 10,000 tons per year by replacing imported water <br />with high quality and low total dissolved solids advanced treated water. <br />Budget Category (a): Project Administration <br />Task 1: Proiect Management <br />Manage contract with Grantee including compliance with grant requirements, and preparation and submission <br />of supporting grant documents and coordination with the Grantee. Prepare invoices including relevant <br />supporting documentation for submittal to DWR via Grantee. This task also includes administrative <br />responsibilities associated with the project such as coordinating with partnering agencies and managing <br />consultants/contractors. <br />Deliverables: <br />• Invoices and associated backup documentation <br />Task 2: Reporting <br />Prepare progress reports detailing work completed during reporting period as outlined in Exhibit F of this <br />Agreement. Submit reports to DWR via Grantee. <br />Prepare Project Completion Report and submit to DWR via Grantee, no later than 90 days after project <br />completion for DWR Project Manager's comment and review. The report shall be prepared and presented in <br />accordance with guidance as outlined in Exhibit F. <br />Deliverables: <br />• Quarterly Project Progress Reports <br />• Project Completion Report <br />• Documentation (e.g., photo) of "Acknowledgment of Credit & Signage" per Standard Condition D.2 <br />Budget Category (b): Land Purchase/Easement <br />Task 3: Land Purchase — Not Applicable <br />Budget Category (c): Planning/Design/Engineering/Environmental Documentation <br />Task 4: Feasibility Studies <br />A project engineer's report titled "Engineer's Report for the Groundwater Replenishment System Final <br />Expansion Project" was completed as a separate part of the project development process. <br />Deliverables: <br />0 Relevant Feasibility Studies <br />