Laserfiche WebLink
DocuSign Envelope ID: 7DOD574C-B1E5-4A94-98CC-C2B16DDD7DC6 <br />EXHIBIT 5 <br />Grant greemen o. <br />Page 17 of 71 <br />Task 9: Implementation <br />Implementation activities are outlined below: <br />Fuel break construction activities include mobilization and demobilization of forestry hand crews; hand crews, <br />mechanical mastication, and other common fuel techniques starting at one end of fuel break, working towards <br />the other; and hand crews piling or loping and scattering slash for subsequent disposal. <br />Prescribed fire activities to dispose of activity fuels would include cutting a fire line around each fuel break <br />section and lighting the piles on fire in a systematic order from one side of the fuel break to the other side until <br />all piles have been disposed of. <br />Deliverables: <br />• Photographic Documentation of Progress <br />