My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-10-19
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
10/19/2021 Regular and Special
>
AGENDA PACKET_2021-10-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/18/2021 3:40:52 PM
Creation date
10/18/2021 3:37:47 PM
Metadata
Fields
Template:
City Clerk
Doc Type
Agenda Packet
Date
10/19/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
518
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fee Proposal <br />City of Santa Ana 6-1 <br />Pavement Management Program Update <br />Fee Proposal <br />Bucknam Infrastructure Group, Inc. has included a time and materials, not-to-exceed fee for the <br />City’s consideration (separate envelope). Our fee follows the described tasks shown within the <br />Scope of Work. <br />Additionally, we have created specific line item fee summaries to show the projected costs for <br />surveying all MPAH, Local and Alley networks this fiscal year. <br />Bucknam is willing to “lock-in” our current hourly rate schedule for the City’s three-year PMP <br />contract as well as for the potential latter two years through FY 2025. <br />As indicated within our fee, all tasks are negotiable. <br /> <br /> <br />City Council 18 –47 10/19/2021
The URL can be used to link to this page
Your browser does not support the video tag.