Laserfiche WebLink
Customers are responsible for the cleanliness and sanitation of Carts. Contractor shall <br />steam clean Carts upon request of Customers at the rates shown in the approved rate <br />schedule. Contractor may replace carts in lieu of steam cleaning Carts, but may only <br />charge the Customer the steam cleaning rate in the approved rate schedule. <br />All Carts in service for the duration of this Agreement shall comply with color and <br />labeling requirements specified by CalRecycle under SB 1383. <br />4.7.4.3 Bins <br />A. Cleaning and Maintenance. Contractor shall provide Customers with <br />new Refuse, Recycling and Organics Bins at the start of service under this Agreement at <br />no additional charge, and shall maintain Containers in safe working condition <br />throughout the Term of this Agreement and any extensions. The size of Contractor - <br />provided Bins shall be determined by mutual agreement of Customer and Contractor, <br />and shall be subject to City approval. All Bins in use shall be constructed of heavy <br />metal, or other suitable, durable material, and shall be watertight and well painted. <br />Wheels, forklift slots, and other apparatuses, which were designed for movement, <br />loading, or unloading of the Bin shall be maintained in good repair. <br />Contractor shall clean and sanitize Bins at Customer locations once per Rate Year at no <br />additional cost upon Customer or City request, or if required to maintain the <br />Containers in a clean condition. Contractor shall perform cleaning, repainting, or <br />replacement of Bins as necessary to prevent a nuisance caused by odors or vector <br />harborage. When a Bin is removed for cleaning, Contractor shall replace the Bin, either <br />temporarily or as a change -out, with another Container at no additional charge to <br />Customer. Additional cleanings beyond one cleaning per Rate Year per Customer shall <br />be provided at the rates included in the approved rate schedule. <br />B. Bin Identification and Color. Each Bin placed in City by Contractor shall <br />have the name of Contractor and phone number in letters not less than three (3) inches <br />high on the exterior of the Bin so as to be visible when the Bin is placed for use. Bins <br />shall be labeled to include bilingual (English and Spanish) and graphic instruction on <br />what materials should and should not be placed in each Bin. Contractor shall repaint <br />Bins upon City's request if the City deems it necessary to maintain a neat appearance. <br />All Bins in service for the duration of this Agreement shall comply with color and <br />labeling requirements specified by CalRecycle under SB 1383. <br />August 17, 2021 78 City of Santa Ana <br />