Laserfiche WebLink
TS.660Sjudifz!Xbufs!Jnqspwfnfou!Qspkfdu! <br />Dpotusvdujpo!Nbobhfnfou!'!Jotqfdujpo!Tfswjdft <br />workers, staff, and the public from the transmission <br />Our team will prepare the agenda, chair all of COVID-19 and variants. <br />meetings, and issue subsequent meeting notes. <br />In addition to weekly progress meetings where <br />A crucial task for our Inspector is to verify quantities <br />safety, anticipated work, schedule, and submittals <br />for recommended payment of the contractor’s <br />are discussed, there may be internal meetings <br />monthly pay application. Spreadsheets are used <br />with the City or issue resolution meetings. <br />to track bid items such as the amount of concrete <br />Tailgate, weekly and monthly safety meetings <br />used for each concrete mix design, the amount <br />and third-party coordination meetings will also be <br />of asphalt placed per mix and day, the amount of <br />held. For time-critical materials, we encourage <br />aggregate base placed, etc. This is also used to <br />and conduct readiness meetings between the <br />ensure quality assurance testing frequencies are <br />designer, contractor, and supplier, as-needed, to <br />met in a timely manner. <br />expedite the approval process and avoid multiple <br />Our Contracts Administrator will receive and review <br />re-submittals and the associated loss of time. <br />While we do not want to interfere with the <br />payroll submissions to our inspector’s daily reports <br />contractor’s means and methods of performing <br />to verify consistency. They will generate a list of <br />their work, there are several things that we can <br />all contractors that worked each week and will <br />do to promote a positive attitude towards best <br />practices: <br />or a ‘no work performed’ statement provided. <br />•Remind the contractor of the requirement <br />Our Project Manager will receive, review, and <br />to implement an approved safety program <br />recommend to the City for payment the construction <br />•Participate with the contractor in safety <br />reward lunches <br />quantities and pertinent supporting documentation. <br />•Report unsafe acts or conditions <br />All pay items are documented on Quantity Sheets <br />•Promote the tracking and posting of project <br />(Q Sheets) per Caltrans procedures. Timely <br />safety statistics <br />processing of progress payments represents a <br />We conduct a review of the site to verify all safety <br />measures are in place, and we look beyond <br />the immediate limits of the project to see if an we calculate and forecast to asses if a bid item <br />unintended consequence is a result of the project will exceed 5% of the original bid quantity. If we <br />trained and promote safe practices by pointing City with enough advance notice to take corrective <br />out equipment or situations that are not safe and action or facilitate a change order. It is important <br />praising a safe work approach. Berg will ensure to encourage the contractor to submit timely billing <br />that the contractor is made aware of and follows <br />the most current City, cunty, and CDC Health to avoid delay claims. <br />mandates, such as those designed to protect <br />Cfsh!'!Bttpdjbuft-!Jod/! <br /> <br />