My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
AGENDA PACKET_2021-11-02
Clerk
>
Agenda Packets / Staff Reports
>
City Council (2004 - Present)
>
2021
>
11/02/2021 Regular and Special
>
AGENDA PACKET_2021-11-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2021 1:58:52 PM
Creation date
11/2/2021 1:58:05 PM
Metadata
Fields
Template:
City Clerk
Date
11/2/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
503
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TS.660Sjudifz!Xbufs!Jnqspwfnfou!Qspkfdu! <br />Dpotusvdujpo!Nbobhfnfou!'!Jotqfdujpo!Tfswjdft <br />Typically, we encourage the contractor to meet are very important for monitoring the contractor’s <br />with us prior to formal submission of the progress schedule and having a detailed look into each <br />payment request to make certain that there are no week of the project including: <br />miscommunications that might delay review and <br />•Total work days, weather and manpower <br />statistics <br />ensure that the contractor is not being overpaid, <br />•Status of potential changes and change <br />the review includes: <br />orders <br />•Review of as-built documentation to make •Representative progress photos <br />certain that it is up to date. <br />! <br />•Review of on-site materials advance <br />!vduj <br />!!Qspkfdu!Dmptfpvu <br />payments (if allowed under contract) to <br />make certain that materials previously <br />paid for remain properly stored and, if <br />Once substantial completion occurs, a punch list <br />incorporated into the work, are deducted <br />is developed of items requiring the contractor’s <br />from the advance installed price. <br />attention to be completed. Our team will schedule <br />•Review of amounts withheld to correct <br />so that discrepancy lists are completed in a timely <br />manner. Qptu. <br />Consistent and complete recording of project <br />progress is important to keep City staff informed <br />of what is happening, to provide a comprehensive <br />Our team will maintain redline as-built plans <br />record of work performed and the quality of that <br />throughout construction. As RFIs and design <br />work, and to have accurate documentation in the <br />event that there is a change or claim. Daily reports <br />changes into the redline as-built plans. Any <br />are one tool to make certain that all pertinent <br />additional contractor as-built deviations from the <br />information is gathered, including: <br />design documents are included in the redline as- <br />•Climate conditions and their effect, if any, <br />built plans. At the conclusion of the construction <br />on work activities <br />phase, we forward the redline as-built plan to <br />•Number of workers by trades, including <br />shift work <br />plans. <br />•Material and equipment <br />•Construction activities by trade and <br />location <br />All claims and payment items must be negotiated <br />•Special inspections <br />• <br />retention will not be released until acceptance of <br />•Observations of work completed <br />the project by appropriate authorities. <br />•Interesting or unusual occurrences <br />As construction work approaches completion, we <br />•Any work-related, off-site activity <br />work with the contractor to coordinate the collection <br />•Work-related discussions, <br />correspondence, or visitors to the siteof warranties, guarantees, lien releases, spare <br />parts, operation and maintenance manuals, and <br />Our monthly reports will contain a construction <br />record documentation. We review documentation <br />progress status update to provide you with a <br />management level overview of construction to make certain that it is in the proper format and <br />contains the information required by contract. <br />progress and issues. In each case, we address <br />We compile this information to verify that all <br />how we are proceeding to resolve issues. Weekly <br />documentation is complete prior to issuing a <br />meetings, a summary of work activities, and <br />schedule updates from the week. These reports <br />Cfsh!'!Bttpdjbuft-!Jod/! <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.