Laserfiche WebLink
SCOPE OF WORK <br /> A. INTRODUCTION AND BACKGROUND <br /> The City of Santa Ana is located in the County of Orange in Southern California. The City <br /> encompasses 27.2 square miles and a population over 343,000 people. The City of Santa Ana <br /> Public Works Agency — Water Resources Division oversees and maintains the daily operations <br /> of the Water System and Sanitary Sewer System. The City of Santa Ana's water system is <br /> comprised of approximately 478 miles of water main, 45 MG of storage at five (5) sites, seven <br /> (7) MWD connections, 21 groundwater wells, seven (7) pump stations, four (4) pressure <br /> regulating stations and utilizes two (2) pressure zones. Control and monitoring of the water <br /> system is coordinated via the City's supervisory control and data acquisition (SCADA) system. <br /> The City maintains and operates over 50 remote terminal units and control panels. <br /> The City of Santa Ana Public Works Agency Water Resources Division is soliciting <br /> proposals from qualified firms to provide industrial control panel <br /> construction/fabrication and design services on an as-needed basis. Control panel <br /> programming and system integration is not included in this contract. The City intends to <br /> select and enter into agreements with up to three firms to provide the described services for <br /> an aggregate annual amount amongst all selected firms. <br /> B. CONTRACTOR RESPONSIBILITIES <br /> The City of Santa Ana invites proposals to establish multiple contracts with vendors <br /> who can build and/or design industrial control panels for pressure control stations, <br /> water pump stations, sewer lift stations and water well sites. The Contractor shall provide <br /> all supervision, labor, tools, supplies, materials, vehicles, lifts, equipment, and transportation to <br /> ensure effective performance of services as described herein. The Contractor shall also be <br /> responsible for providing any required quality assurance and quality control testing services <br /> and training services. All work shall be in accordance with applicable trade practices, <br /> workmanship, meet warranties and shall conform to all applicable laws, codes and regulations. <br /> Business hours are considered from 7:00 A.M. to 5:00 P.M. (Monday through Friday). Any time <br /> outside of business hours of operation may be considered after hours/weekends. <br /> C. SCOPE OF SERVICES <br /> The scope of work will include industrial control panel building services, factory acceptance <br /> testing (FAT), in-field verification testing, panel design services, training, and all miscellaneous <br /> work (not including programming and integration) necessary to complete the following types of <br /> tasks: <br /> 1. PANEL BUILDING SERVICES <br /> The Contractor shall construct and furnish industrial control panels, and all work shall be in <br /> compliance with the National Electric Code (NEC), Underwriters Laboratories (UL) 508A <br /> (standard for the construction of industrial control panels) and UL508 (standard for safety <br /> for industrial control equipment). The Contractor shall be responsible for the procurement of <br /> all materials and the fabrication of the control panels based on provided design drawings <br /> City of Santa Ana - FP 2 -100 <br /> Water Resources Panel Building Services <br /> Page 14 of 39 <br />